Singh, G. Design requirements document for the phase one privitization facility electrical power, report, September 30, 1996; (https://digital.library.unt.edu/ark:/67531/metadc685401/m1/1/: accessed December 10, 2018), University of North Texas Libraries, Digital Library, digital.library.unt.edu; .