National Ignition Facility Risk Management Plan

PDF Version Also Available for Download.

Description

The NIF Risk Management Plan has been prepared in accordance with the DOE Life Cycle Asset Management Good Practice Guide to support Critical Decision 3 of the NIF Project. The objectives of the plan are to: 1) identify the risks to the completion of the Project in terms of meeting technical and regulatory requirements, cost, and schedule, 2) assess the risks in terms of likelihood of occurrence and their impact potential relative to technical performance, ES&H (environment, safety and health), costs, and schedule, and 3) address each identified risk in terms of suitable risk mitigation measures. The documents that form ... continued below

Physical Description

31 p.; Other: FDE: PDF; PL:

Creation Information

Brereton, S.J. February 1, 1997.

Context

This report is part of the collection entitled: Office of Scientific & Technical Information Technical Reports and was provided by UNT Libraries Government Documents Department to Digital Library, a digital repository hosted by the UNT Libraries. More information about this report can be viewed below.

Who

People and organizations associated with either the creation of this report or its content.

Sponsor

Publisher

Provided By

UNT Libraries Government Documents Department

Serving as both a federal and a state depository library, the UNT Libraries Government Documents Department maintains millions of items in a variety of formats. The department is a member of the FDLP Content Partnerships Program and an Affiliated Archive of the National Archives.

Contact Us

What

Descriptive information to help identify this report. Follow the links below to find similar items on the Digital Library.

Description

The NIF Risk Management Plan has been prepared in accordance with the DOE Life Cycle Asset Management Good Practice Guide to support Critical Decision 3 of the NIF Project. The objectives of the plan are to: 1) identify the risks to the completion of the Project in terms of meeting technical and regulatory requirements, cost, and schedule, 2) assess the risks in terms of likelihood of occurrence and their impact potential relative to technical performance, ES&H (environment, safety and health), costs, and schedule, and 3) address each identified risk in terms of suitable risk mitigation measures. The documents that form the basis for this risk assessment are as follows: 1. Final Programmatic Environmental Impact Statement for Stockpile Stewardship and Management (DOE, 1996a) and Record of Decision (DOE, 1996b), 2. Preliminary Hazards Analysis (Brereton, 1993), 3. Fire Hazards Analysis (Jensen, 1997), 4. Preliminary Safety Analysis Report (LLNL, 1996a), 5. Reliability, Availability and Maintainability Report, 6. Radiation Protection Evaluation, 7. Primary Criteria and Functional Requirements (LLNL, 1996b), 8. Project Execution Plan (DOE, 1996c), 9. Schedule Risk Assessment, 10. Construction Safety Program (LLNL, 1997), 11. Title I Design Media, 12. Congressional Data Sheet. The process used in developing this plan was to form a Risk Assessment team of knowledgeable project personnel. This included: Assurances Manager, Systems Integration Manager, Project Control Manager, a Risk Management consultant, Deputy Associate Project Engineer for Activation and Start-up (Co-chairperson), and Lead Engineer for Safety Analysis (Co-chairperson). They were familiar with the risk basis documents and developed a list of the key risk elements. A methodology for assigning likelihoods, consequences, and risks was developed. Risk elements were then reviewed, and likelihoods, consequences, and risks were assigned. Risk mitigation measures were then developed. Comments were obtained, resolved and incorporated, and this document presents the results of the assessment.

Physical Description

31 p.; Other: FDE: PDF; PL:

Notes

OSTI as DE98057696

Source

  • Other Information: PBD: 1 Feb 1997

Language

Item Type

Identifier

Unique identifying numbers for this report in the Digital Library or other systems.

  • Other: DE98057696
  • Report No.: UCRL-ID--126809
  • Grant Number: W-7405-ENG-48
  • DOI: 10.2172/304629 | External Link
  • Office of Scientific & Technical Information Report Number: 304629
  • Archival Resource Key: ark:/67531/metadc682712

Collections

This report is part of the following collection of related materials.

Office of Scientific & Technical Information Technical Reports

Reports, articles and other documents harvested from the Office of Scientific and Technical Information.

Office of Scientific and Technical Information (OSTI) is the Department of Energy (DOE) office that collects, preserves, and disseminates DOE-sponsored research and development (R&D) results that are the outcomes of R&D projects or other funded activities at DOE labs and facilities nationwide and grantees at universities and other institutions.

What responsibilities do I have when using this report?

When

Dates and time periods associated with this report.

Creation Date

  • February 1, 1997

Added to The UNT Digital Library

  • July 25, 2015, 2:20 a.m.

Description Last Updated

  • Feb. 23, 2016, 5:38 p.m.

Usage Statistics

When was this report last used?

Yesterday: 0
Past 30 days: 1
Total Uses: 7

Interact With This Report

Here are some suggestions for what to do next.

Start Reading

PDF Version Also Available for Download.

Citations, Rights, Re-Use

Brereton, S.J. National Ignition Facility Risk Management Plan, report, February 1, 1997; California. (digital.library.unt.edu/ark:/67531/metadc682712/: accessed November 18, 2017), University of North Texas Libraries, Digital Library, digital.library.unt.edu; crediting UNT Libraries Government Documents Department.