Remedial investigation/feasibility study of the Clinch River/Poplar Creek operable unit. Volume 1, main text Page: 3 of 553
This report is part of the collection entitled: Office of Scientific & Technical Information Technical Reports and was provided to UNT Digital Library by the UNT Libraries Government Documents Department.
Extracted Text
The following text was automatically extracted from the image on this page using optical character recognition software:
. DOE/OR/01-139, V1&D2
ORNL/ER-315/V1&D2
Energy Systems Environmental Restoration Program
Remedial Investigation/Feasibility Study
of the Clinch River/Poplar Creek
Operable Unit
Volume 1. Main Text
Date Issued-March 1996
Chaps. 7-10 prepared by
Jacobs Engineering Group Inc.
Oak Ridge, Tennessee
under contract number DE-AC05-930R22028
Prepared for
U.S. Department of Energy
Office of Environmental Management
under budget and reporting code EW 20
Environmental Restoration Activities
OAK RIDGE Y-12 PLANT
Oak Ridge, Tennessee 37831-8169
managed by
LOCKHEED MARTIN ENERGY SYSTEMS, INC.
for the
U.S. DEPARTMENT OF ENERGY ;
under contract DE-AC05-840R21400
- MASTER
Upcoming Pages
Here’s what’s next.
Search Inside
This report can be searched. Note: Results may vary based on the legibility of text within the document.
Tools / Downloads
Get a copy of this page or view the extracted text.
Citing and Sharing
Basic information for referencing this web page. We also provide extended guidance on usage rights, references, copying or embedding.
Reference the current page of this Report.
Remedial investigation/feasibility study of the Clinch River/Poplar Creek operable unit. Volume 1, main text, report, March 1, 1996; Tennessee. (https://digital.library.unt.edu/ark:/67531/metadc681916/m1/3/: accessed March 28, 2024), University of North Texas Libraries, UNT Digital Library, https://digital.library.unt.edu; crediting UNT Libraries Government Documents Department.