Traditionally, pollution prevention (P2) assessments have been performed on existing facilities and ongoing operations, well after the completion of design and construction. It has been theorized that more success can be achieved by moving P2 upstream into the design process, where an estimated 70% of a project`s total life cycle costs are initially fixed. Decisions made during design to prevent or minimize the amount of waste generated can reap benefits for many years to come. This is especially true when designing systems for handling hazardous and radioactive wastes for treatment, storage, and disposal. P2 assessments performed during design of such ... continued below

Physical Description

15 p.

Creation Information

Del Mar, R.A. August 15, 1997.

Context

This article is part of the collection entitled: Office of Scientific & Technical Information Technical Reports and was provided by UNT Libraries Government Documents Department to Digital Library, a digital repository hosted by the UNT Libraries. More information about this article can be viewed below.

Who

People and organizations associated with either the creation of this article or its content.

Author

Sponsor

Publisher

  • Fluor Daniel Hanford, Inc.
    Publisher Info: Fluor Daniel Hanford, Inc., Richland, WA (United States)
    Place of Publication: Richland, Washington

Provided By

UNT Libraries Government Documents Department

Serving as both a federal and a state depository library, the UNT Libraries Government Documents Department maintains millions of items in a variety of formats. The department is a member of the FDLP Content Partnerships Program and an Affiliated Archive of the National Archives.

Contact Us

What

Descriptive information to help identify this article. Follow the links below to find similar items on the Digital Library.

Description

Traditionally, pollution prevention (P2) assessments have been performed on existing facilities and ongoing operations, well after the completion of design and construction. It has been theorized that more success can be achieved by moving P2 upstream into the design process, where an estimated 70% of a project`s total life cycle costs are initially fixed. Decisions made during design to prevent or minimize the amount of waste generated can reap benefits for many years to come. This is especially true when designing systems for handling hazardous and radioactive wastes for treatment, storage, and disposal. P2 assessments performed during design of such projects can uncover significant savings to be reaped during project construction, operations, and/or decommissioning. However, many project managers are still reluctant to include some type of P2 review or assessment as part of the design effort, because the immediate payback to the design entity is difficult to quantify. This paper presents the results of a P2 assessment performed on a design project at Hanford which identified close to $500,000 in construction savings while minimizing low-level and mixed radioactive waste generation. This paper describes the process used to per-form the assessment, discusses its results, and provides lessons-learned for future P2 design assessments.

Physical Description

15 p.

Notes

INIS; OSTI as DE99050164

Source

  • 13. pollution prevention conference, Atlanta, GA (United States), 26-28 Aug 1997

Language

Item Type

Identifier

Unique identifying numbers for this article in the Digital Library or other systems.

  • Other: DE99050164
  • Report No.: HNF-SA--3231-FP
  • Report No.: CONF-970854--
  • Grant Number: AC06-96RL13200
  • Office of Scientific & Technical Information Report Number: 341289
  • Archival Resource Key: ark:/67531/metadc680714

Collections

This article is part of the following collection of related materials.

Office of Scientific & Technical Information Technical Reports

Reports, articles and other documents harvested from the Office of Scientific and Technical Information.

Office of Scientific and Technical Information (OSTI) is the Department of Energy (DOE) office that collects, preserves, and disseminates DOE-sponsored research and development (R&D) results that are the outcomes of R&D projects or other funded activities at DOE labs and facilities nationwide and grantees at universities and other institutions.

What responsibilities do I have when using this article?

When

Dates and time periods associated with this article.

Creation Date

  • August 15, 1997

Added to The UNT Digital Library

  • July 25, 2015, 2:20 a.m.

Description Last Updated

  • June 14, 2016, 6:49 p.m.

Usage Statistics

When was this article last used?

Yesterday: 0
Past 30 days: 0
Total Uses: 3

Interact With This Article

Here are some suggestions for what to do next.

Start Reading

PDF Version Also Available for Download.

International Image Interoperability Framework

IIF Logo

We support the IIIF Presentation API

Del Mar, R.A. Deployment of pollution prevention during design -- a case study, article, August 15, 1997; Richland, Washington. (digital.library.unt.edu/ark:/67531/metadc680714/: accessed October 16, 2018), University of North Texas Libraries, Digital Library, digital.library.unt.edu; crediting UNT Libraries Government Documents Department.