Project W-320, 241-C-106 sluicing: Construction specification W-320-C7

PDF Version Also Available for Download.

Description

This supporting document has been prepared to make the construction specifications for Project W-320 readily available. Project W-320, Waste Retrieval Sluicing System (WRSS), specification is for procurement, fabrication and installation of equipment at the C Tank Farm, including Operator Station and some equipment just outside the C Tank Farm fence, necessary to support the sluicing operation. Work consists of furnishing labor, equipment, and materials to provide the means to procure materials and equipment, fabricate items, excavate and place concrete, and install equipment, piping, wiring, and structures in accordance with the Contract Documents. Major work elements include: Excavation for process and ... continued below

Physical Description

184 p.

Creation Information

Bailey, J. W. July 20, 1998.

Context

This report is part of the collection entitled: Office of Scientific & Technical Information Technical Reports and was provided by UNT Libraries Government Documents Department to Digital Library, a digital repository hosted by the UNT Libraries. More information about this report can be viewed below.

Who

People and organizations associated with either the creation of this report or its content.

Author

Sponsors

Publisher

  • Fluor Daniel Hanford, Inc.
    Publisher Info: Fluor Daniel Hanford, Inc., Richland, WA (United States)
    Place of Publication: Richland, Washington

Provided By

UNT Libraries Government Documents Department

Serving as both a federal and a state depository library, the UNT Libraries Government Documents Department maintains millions of items in a variety of formats. The department is a member of the FDLP Content Partnerships Program and an Affiliated Archive of the National Archives.

Contact Us

What

Descriptive information to help identify this report. Follow the links below to find similar items on the Digital Library.

Description

This supporting document has been prepared to make the construction specifications for Project W-320 readily available. Project W-320, Waste Retrieval Sluicing System (WRSS), specification is for procurement, fabrication and installation of equipment at the C Tank Farm, including Operator Station and some equipment just outside the C Tank Farm fence, necessary to support the sluicing operation. Work consists of furnishing labor, equipment, and materials to provide the means to procure materials and equipment, fabricate items, excavate and place concrete, and install equipment, piping, wiring, and structures in accordance with the Contract Documents. Major work elements include: Excavation for process and fire protection piping, electrical conduit trenches, and foundations for small structures; Placement of concrete cover blocks, foundations, and equipment pads; Procurement and installation of double walled piping, electrical conduit, fire and raw water piping, chilled water piping, and electrical cable; Procurement and installation of above-ground ventilation system piping between the (HVAC) Process building and Tank C-106; Core drill existing concrete; Furnish and installation of electrical distribution equipment; Installation of the concrete foundation, and assembly installation of the two Seismic Shutdown Systems with Environmental Enclosures; Fabrication and installation of in-pit pipe jumpers, including related valves, instruments and wiring; and Installation of a vertical submersible pump, horizontal booster pump, and winch assembly into tank access riser pits.

Physical Description

184 p.

Notes

INIS; OSTI as DE99050838

Source

  • Other Information: PBD: 20 Jul 1998

Language

Item Type

Identifier

Unique identifying numbers for this report in the Digital Library or other systems.

  • Other: DE99050838
  • Report No.: HNF--2536
  • Grant Number: AC06-96RL13200
  • DOI: 10.2172/344971 | External Link
  • Office of Scientific & Technical Information Report Number: 344971
  • Archival Resource Key: ark:/67531/metadc679418

Collections

This report is part of the following collection of related materials.

Office of Scientific & Technical Information Technical Reports

Reports, articles and other documents harvested from the Office of Scientific and Technical Information.

Office of Scientific and Technical Information (OSTI) is the Department of Energy (DOE) office that collects, preserves, and disseminates DOE-sponsored research and development (R&D) results that are the outcomes of R&D projects or other funded activities at DOE labs and facilities nationwide and grantees at universities and other institutions.

What responsibilities do I have when using this report?

When

Dates and time periods associated with this report.

Creation Date

  • July 20, 1998

Added to The UNT Digital Library

  • July 25, 2015, 2:20 a.m.

Description Last Updated

  • May 18, 2016, 4:56 p.m.

Usage Statistics

When was this report last used?

Yesterday: 0
Past 30 days: 1
Total Uses: 8

Interact With This Report

Here are some suggestions for what to do next.

Start Reading

PDF Version Also Available for Download.

Citations, Rights, Re-Use

Bailey, J. W. Project W-320, 241-C-106 sluicing: Construction specification W-320-C7, report, July 20, 1998; Richland, Washington. (digital.library.unt.edu/ark:/67531/metadc679418/: accessed December 18, 2017), University of North Texas Libraries, Digital Library, digital.library.unt.edu; crediting UNT Libraries Government Documents Department.