The authors systematically analyze impact evaluation results of three commercial lighting rebate DSM programs. The research includes (1) analysis of ex ante and ex post estimates of program performance, broken down into critical program parameters: hours of operation, watts saved per measure, and measures installed per site; (2) construction of probability distributions of program performance, both in the aggregate and for these critical program parameters; and (3) use of these analyses and distributions to draw conclusions about the accuracy of savings estimates from a variety of evaluation methods. The analysis suggests that realization rates (a ratio of metered savings estimates …
continued below
Serving as both a federal and a state depository library, the UNT Libraries Government Documents Department maintains millions of items in a variety of formats. The department is a member of the FDLP Content Partnerships Program and an Affiliated Archive of the National Archives.
Descriptive information to help identify this article.
Follow the links below to find similar items on the Digital Library.
Description
The authors systematically analyze impact evaluation results of three commercial lighting rebate DSM programs. The research includes (1) analysis of ex ante and ex post estimates of program performance, broken down into critical program parameters: hours of operation, watts saved per measure, and measures installed per site; (2) construction of probability distributions of program performance, both in the aggregate and for these critical program parameters; and (3) use of these analyses and distributions to draw conclusions about the accuracy of savings estimates from a variety of evaluation methods. The analysis suggests that realization rates (a ratio of metered savings estimates to tracking database savings estimates) for the sample of participants they examine are subject to tremendous variability, calling into question the usefulness of a point estimate of the realization rate. Discrepancies in estimates of hours of operation are responsible for most of the uncertainty in the realization rate. Finally, the impact of shorter measure lifetimes on savings estimates suggest that persistence studies should be an evaluation priority.
This article is part of the following collection of related materials.
Office of Scientific & Technical Information Technical Reports
Reports, articles and other documents harvested from the Office of Scientific and Technical Information.
Office of Scientific and Technical Information (OSTI) is the Department of Energy (DOE) office that collects, preserves, and disseminates DOE-sponsored research and development (R&D) results that are the outcomes of R&D projects or other funded activities at DOE labs and facilities nationwide and grantees at universities and other institutions.
Sonnenblick, R. & Eto, J.Uncertainty in Site Inspection and Tracking Database Estimates of Savings,
article,
December 31, 1988;
[Pittsburgh, Pennsylvania].
(https://digital.library.unt.edu/ark:/67531/metadc679249/:
accessed March 28, 2024),
University of North Texas Libraries, UNT Digital Library, https://digital.library.unt.edu;
crediting UNT Libraries Government Documents Department.