Tank 241-SY-103 tank characterization plan. Revision 1 Page: 3 of 15
This report is part of the collection entitled: Office of Scientific & Technical Information Technical Reports and was provided to UNT Digital Library by the UNT Libraries Government Documents Department.
Extracted Text
The following text was automatically extracted from the image on this page using optical character recognition software:
I... .. EC -us . frmp.1
ENGINEERING CHANGE NOTICE EN(s o rmp.1
Page 2 of 2 (325709
1.Design 16. Cost Impact 17. Schedule impact (days)
Verification ENGINEERING CONSTRUCTION
Required
[] Yes Additional H] $ Additional ] $ Improvement [
[X] No Savings $ Savings $ De.ay
18. Change Impact Review: Indicate the related documents (other than thia engineering documents identified on Side 1)
that will be affected by the change described in Block 12. Enter thin affected document number in Block 19.
SDD/DD rlSeismic/Stress Analysis rlTank Calibration Manual
Functional Design Criteria L 1Stress/Design Report L Health Physics Procedure
Operating Specification LrJ nterface Control Drawing lrSpares Multiple Unit Listing
Criticality Specification L Calibration Procedure L 1Test Procedures/Specification L
Conceptual Design Report L Installation Pro cedure f lComponent Index J
Equipment Spec. Lr1Maintenance Procedure L A SME Coded Item L
Const. Spec. J7Engineering Procedure L Human Factor Consideration
Procurement Spec. Operating Instruction JTComputer Software l
Vendor Information rOperating Procedure f 7Electric Circuit Schedule
OM Manual ]f Operational Safety Requirement L 7ICRS Procedure l
FSARISAR L IEFD Drawing L Process Control Manual/Plan J
Safety Equipment List L 1Cell Arrangement Drawing Process Flow Chart
Radiation Work Permit L Essential Material Specification f1Purchase Requisition L
Environmental Impact Statement LflFac. Proc. Samp. Schedule L Tickler File J
Environmental Report L Inspection Plan J
Environmental Permit LfInventory Adjustment Request
19. Other Affected Documents: (NOTE: Documents listed below will not be revised by this ECN.) Signatures below
indicate that the signing organization has been notified of other affected documents listed below.
Document Number/Revision Document Number/Revis ion Document Number Revision
20. Approvals
Signature Date Signature Date
OPERATIONS AND ENGINEERING ARCHITECT-ENGINEER
Cog. Eng. C. S. .omi , / r PE
Cog. Mgr. S. J. Eberlein ~ -.:- QA
OA ff Safety
Safety Design
Environ. Environ.
Other Other
DEPARTMENT OF ENERGY
Signature or a Control Number that
tracks the Approval Signature
ADDITIONAL
A-7900-013-3 (11/94) GEF096
Upcoming Pages
Here’s what’s next.
Search Inside
This report can be searched. Note: Results may vary based on the legibility of text within the document.
Tools / Downloads
Get a copy of this page or view the extracted text.
Citing and Sharing
Basic information for referencing this web page. We also provide extended guidance on usage rights, references, copying or embedding.
Reference the current page of this Report.
Homi, C. S. Tank 241-SY-103 tank characterization plan. Revision 1, report, October 5, 1995; Richland, Washington. (https://digital.library.unt.edu/ark:/67531/metadc678819/m1/3/: accessed April 23, 2024), University of North Texas Libraries, UNT Digital Library, https://digital.library.unt.edu; crediting UNT Libraries Government Documents Department.