Recalculation of shielding for the addition of a PAR

PDF Version Also Available for Download.

Description

The shielding estimates for the Electron and Positron Linacs and the Booster Synchrotron, contained in the 1987 Conceptual Design Report (CDR) of the APS (ANL-87-15), have been reviewed and recalculated, along with newly initiated calculations of the required shielding for the addition of a Positron Accumulator Ring (PAR). Several new assumptions with respect to beam intensity, projected losses in the system, and assumed operational time have been incorporated into the calculations. Details of the previous calculations, which describe the methodology used, may be found in APS Light Source Note LS-90.

Physical Description

15 p.

Creation Information

Moe, H.J. August 1, 1988.

Context

This report is part of the collection entitled: Office of Scientific & Technical Information Technical Reports and was provided by UNT Libraries Government Documents Department to Digital Library, a digital repository hosted by the UNT Libraries. More information about this report can be viewed below.

Who

People and organizations associated with either the creation of this report or its content.

Author

Sponsor

Publisher

Provided By

UNT Libraries Government Documents Department

Serving as both a federal and a state depository library, the UNT Libraries Government Documents Department maintains millions of items in a variety of formats. The department is a member of the FDLP Content Partnerships Program and an Affiliated Archive of the National Archives.

Contact Us

What

Descriptive information to help identify this report. Follow the links below to find similar items on the Digital Library.

Description

The shielding estimates for the Electron and Positron Linacs and the Booster Synchrotron, contained in the 1987 Conceptual Design Report (CDR) of the APS (ANL-87-15), have been reviewed and recalculated, along with newly initiated calculations of the required shielding for the addition of a Positron Accumulator Ring (PAR). Several new assumptions with respect to beam intensity, projected losses in the system, and assumed operational time have been incorporated into the calculations. Details of the previous calculations, which describe the methodology used, may be found in APS Light Source Note LS-90.

Physical Description

15 p.

Notes

OSTI as DE96015108

Source

  • Other Information: PBD: Aug 1988

Language

Item Type

Identifier

Unique identifying numbers for this report in the Digital Library or other systems.

  • Other: DE96015108
  • Report No.: LS--116(ANL)
  • Grant Number: W-31109-ENG-38
  • DOI: 10.2172/376377 | External Link
  • Office of Scientific & Technical Information Report Number: 376377
  • Archival Resource Key: ark:/67531/metadc678734

Collections

This report is part of the following collection of related materials.

Office of Scientific & Technical Information Technical Reports

What responsibilities do I have when using this report?

When

Dates and time periods associated with this report.

Creation Date

  • August 1, 1988

Added to The UNT Digital Library

  • July 25, 2015, 2:20 a.m.

Description Last Updated

  • Dec. 16, 2015, 1:12 p.m.

Usage Statistics

When was this report last used?

Yesterday: 0
Past 30 days: 1
Total Uses: 3

Interact With This Report

Here are some suggestions for what to do next.

Start Reading

PDF Version Also Available for Download.

Citations, Rights, Re-Use

Moe, H.J. Recalculation of shielding for the addition of a PAR, report, August 1, 1988; Illinois. (digital.library.unt.edu/ark:/67531/metadc678734/: accessed September 23, 2017), University of North Texas Libraries, Digital Library, digital.library.unt.edu; crediting UNT Libraries Government Documents Department.