Materials Engineering Laboratory interim report, LF-8 and LF-9 support pad fabrication

PDF Version Also Available for Download.

Description

This project was for the fabrication of 50 LF-8 and LF-9 support pads (clamshells) which would conform to the Los Alamos Scientific Laboratory (LASL) drawing provided in Appendix A of this report. Discussions on this contract were initiated in early October and involved delivery of all the pads by January 31, 1977. The project was modified to deliver only 10 pads by the above date. However, since the period encompassed Thanksgiving.and Christmas shutdowns, it was decided that delivery of four units by February 11, 1977 would be satisfactory to all concerned. The remainder would follow on a timely basis. This ... continued below

Physical Description

36 p.

Creation Information

Creed, K.E. March 1, 1977.

Context

This report is part of the collection entitled: Office of Scientific & Technical Information Technical Reports and was provided by UNT Libraries Government Documents Department to Digital Library, a digital repository hosted by the UNT Libraries. It has been viewed 15 times . More information about this report can be viewed below.

Who

People and organizations associated with either the creation of this report or its content.

Author

Sponsor

Provided By

UNT Libraries Government Documents Department

Serving as both a federal and a state depository library, the UNT Libraries Government Documents Department maintains millions of items in a variety of formats. The department is a member of the FDLP Content Partnerships Program and an Affiliated Archive of the National Archives.

Contact Us

What

Descriptive information to help identify this report. Follow the links below to find similar items on the Digital Library.

Description

This project was for the fabrication of 50 LF-8 and LF-9 support pads (clamshells) which would conform to the Los Alamos Scientific Laboratory (LASL) drawing provided in Appendix A of this report. Discussions on this contract were initiated in early October and involved delivery of all the pads by January 31, 1977. The project was modified to deliver only 10 pads by the above date. However, since the period encompassed Thanksgiving.and Christmas shutdowns, it was decided that delivery of four units by February 11, 1977 would be satisfactory to all concerned. The remainder would follow on a timely basis. This report outlines the status of the project at the present time. The data are divided into the following categories for clarity purposes: Mold master definition and fabrication, Process drawings, and Mold and piece part fabrication.

Physical Description

36 p.

Notes

OSTI as DE97000911

Source

  • Other Information: PBD: Mar 1977

Language

Item Type

Identifier

Unique identifying numbers for this report in the Digital Library or other systems.

  • Other: DE97000911
  • Report No.: GEPP--295
  • Grant Number: AC04-76DP00656
  • DOI: 10.2172/405745 | External Link
  • Office of Scientific & Technical Information Report Number: 405745
  • Archival Resource Key: ark:/67531/metadc678521

Collections

This report is part of the following collection of related materials.

Office of Scientific & Technical Information Technical Reports

Reports, articles and other documents harvested from the Office of Scientific and Technical Information.

Office of Scientific and Technical Information (OSTI) is the Department of Energy (DOE) office that collects, preserves, and disseminates DOE-sponsored research and development (R&D) results that are the outcomes of R&D projects or other funded activities at DOE labs and facilities nationwide and grantees at universities and other institutions.

What responsibilities do I have when using this report?

When

Dates and time periods associated with this report.

Creation Date

  • March 1, 1977

Added to The UNT Digital Library

  • July 25, 2015, 2:20 a.m.

Description Last Updated

  • Nov. 24, 2015, 11:55 a.m.

Usage Statistics

When was this report last used?

Yesterday: 0
Past 30 days: 0
Total Uses: 15

Interact With This Report

Here are some suggestions for what to do next.

Start Reading

PDF Version Also Available for Download.

Citations, Rights, Re-Use

Creed, K.E. Materials Engineering Laboratory interim report, LF-8 and LF-9 support pad fabrication, report, March 1, 1977; United States. (digital.library.unt.edu/ark:/67531/metadc678521/: accessed November 23, 2017), University of North Texas Libraries, Digital Library, digital.library.unt.edu; crediting UNT Libraries Government Documents Department.