Liquid radioactive waste subsystem design description Page: 3 of 34
This report is part of the collection entitled: Office of Scientific & Technical Information Technical Reports and was provided to UNT Digital Library by the UNT Libraries Government Documents Department.
Extracted Text
The following text was automatically extracted from the image on this page using optical character recognition software:
CONTENTS
PAGE
LIST OF EFFECTIVE PAGES. . . . . . . . . . . . . . . . . . . . . . . . iii
LIST OF ACRONYMS . . . . . . . . . . . . . . . . . . . . . . . . . . . iv
LIST OF DEFINITIONS (TBD) . . . . . . . . . . . . . . . . . . . . . . -
LIST OF ILLUSTRATIONS . . . . . . . . . . . . . . . . . . . . . . . . v
LIST OF TABLES . . . . . . . . . . . . . . . . . . . . . . . . . . . . vi
LIST OF APPENDICES (TBD) . . . . . . . . . . . . . . . . . . . . . . -
PREFACE. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . vii
SUMMARY. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . viii
1 SUBSYSTEM FUNCTIONS AND DESIGN REQUIREMENTS . . . . . . . . . . . 1-1
1.1 Subsystem Functions . . . . . . . . . . . . . . . . . . . . 1-1
1.2 Subsystem Design Requirements . . . . . . . . . . . . . . . 1-1
1.2.1 Subsystem Configuration and Essential Features
Requirements . . . . . . . . . . . . . . . . . . . 1-1
1.2.2 Operating Requirements . . . . . . . . . . . . . . 1-1
1.2.3 Structural Requirements. . . . . . . . . . . . . . 1-2
1.2.4 Environmental Requirements . . . . . . . . . . . . 1-2
1.2.5 Instrumentation and Control Requirements . . . . . 1-2
1.2.6 Surveillance and In-Service Inspection Requirements. 1-2
1.2.7 Availability Requirements. . . . . . . . . . . . . 1-2
1.2.8 Maintenance Requirements . .. -. . . . . . . . . . 1-3
1.2.9 Safety Requirements. . . . . . . . . . . . . . . . 1-3
1.2.10 Codes and Standards Requirements. . . . . . . . . . 1-3
1.2.11 Quality Assurance Requirements. . . . . . . . . . . 1-3
1.2.12 Construction Requirements (TBD) . . . . . . . . . . -
1.2.13 Decommissioning Requirements (TBD). . . . . . . . . -
1.2.14 Sampling Requirements . . . . . . . . . . . . . . . 1-4
2 DESIGN DESCRIPTION. . . . . . . . . . . . . . . . . . . . . . . . 2-1
2.1 Summary Description. . . . . . . . . . . . . . . . . . . . 2-1
2.2 Subsystem Configuration . . . . . . . . . . . . . . . . . . 2-1
2.3 Subsystem Performance Characteristics . . . . . . . . . . . 2-1
2.3.1 Subsystem Operating Modes . . . . . . . . . . . . . 2-1
2.3.2 Subsystem Steady - State Performance. . . . . . . . 2-2
2.3.3 Subsystem Response to Plant Transients. . . . . . . 2-2
2.3.4 Subsystem Failure Modes and Effects. . . . . . . . 2-2
2.4 Subsystem Arrangement . . . . . . . . . . . . . . . . . . . 2-2
2.5 Instrumentation and Control . . . . . . . . . . . . . . . . 2-3
3 COMPONENT FUNCTIONS AND DESIGN REQUIREMENTS (TBD). . . . . . . . -7747-1488436-B4
i
HFD-420t)-
Upcoming Pages
Here’s what’s next.
Search Inside
This report can be searched. Note: Results may vary based on the legibility of text within the document.
Tools / Downloads
Get a copy of this page or view the extracted text.
Citing and Sharing
Basic information for referencing this web page. We also provide extended guidance on usage rights, references, copying or embedding.
Reference the current page of this Report.
Liquid radioactive waste subsystem design description, report, June 1, 1986; United States. (https://digital.library.unt.edu/ark:/67531/metadc676677/m1/3/: accessed April 17, 2024), University of North Texas Libraries, UNT Digital Library, https://digital.library.unt.edu; crediting UNT Libraries Government Documents Department.