This report presents the results of the evaluation of the Turkey Point Nuclear Power Plant, Units 3 and 4, Third 10-Year Interval Inservice Inspection Program Plan, Revision 0, submitted September 9, 1993, including the requests for relief from the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code, Section XI, requirements that the licensee has determined to be impractical. The Turkey Point Nuclear Power Plant, Units 3 and 4, Third 10-Year Interval Inservice Inspection Program Plan is evaluated in Section 2 of this report. The inservice inspection (ISI) program plan is evaluated for (a) compliance with the appropriate ... continued below

Physical Description

46 p.

Creation Information

Brown, B.W.; Feige, E.J.; Galbraith, S.G. & Porter, A.M. February 1, 1995.

Context

This report is part of the collection entitled: Office of Scientific & Technical Information Technical Reports and was provided by UNT Libraries Government Documents Department to Digital Library, a digital repository hosted by the UNT Libraries. It has been viewed 12 times . More information about this report can be viewed below.

Who

People and organizations associated with either the creation of this report or its content.

Sponsor

Publisher

Provided By

UNT Libraries Government Documents Department

Serving as both a federal and a state depository library, the UNT Libraries Government Documents Department maintains millions of items in a variety of formats. The department is a member of the FDLP Content Partnerships Program and an Affiliated Archive of the National Archives.

Contact Us

What

Descriptive information to help identify this report. Follow the links below to find similar items on the Digital Library.

Description

This report presents the results of the evaluation of the Turkey Point Nuclear Power Plant, Units 3 and 4, Third 10-Year Interval Inservice Inspection Program Plan, Revision 0, submitted September 9, 1993, including the requests for relief from the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code, Section XI, requirements that the licensee has determined to be impractical. The Turkey Point Nuclear Power Plant, Units 3 and 4, Third 10-Year Interval Inservice Inspection Program Plan is evaluated in Section 2 of this report. The inservice inspection (ISI) program plan is evaluated for (a) compliance with the appropriate edition/addenda of Section XI, (b) acceptability of the examination sample, (c) correctness of the application of system or component examination exclusion criteria, and (d) compliance with ISI-related commitments identified during previous Nuclear Regulatory Commission (NRC) reviews. The requests for relief are evaluated in Section 3 of this report.

Physical Description

46 p.

Notes

INIS; OSTI as TI95008660

Source

  • Other Information: PBD: Feb 1995

Language

Item Type

Identifier

Unique identifying numbers for this report in the Digital Library or other systems.

  • Other: TI95008660
  • Report No.: INEL--95/0079
  • Grant Number: AC07-94ID13223
  • DOI: 10.2172/34458 | External Link
  • Office of Scientific & Technical Information Report Number: 34458
  • Archival Resource Key: ark:/67531/metadc676539

Collections

This report is part of the following collection of related materials.

Office of Scientific & Technical Information Technical Reports

Reports, articles and other documents harvested from the Office of Scientific and Technical Information.

Office of Scientific and Technical Information (OSTI) is the Department of Energy (DOE) office that collects, preserves, and disseminates DOE-sponsored research and development (R&D) results that are the outcomes of R&D projects or other funded activities at DOE labs and facilities nationwide and grantees at universities and other institutions.

What responsibilities do I have when using this report?

When

Dates and time periods associated with this report.

Creation Date

  • February 1, 1995

Added to The UNT Digital Library

  • July 25, 2015, 2:20 a.m.

Description Last Updated

  • April 8, 2016, 1:01 p.m.

Usage Statistics

When was this report last used?

Yesterday: 0
Past 30 days: 0
Total Uses: 12

Interact With This Report

Here are some suggestions for what to do next.

Start Reading

PDF Version Also Available for Download.

International Image Interoperability Framework

IIF Logo

We support the IIIF Presentation API

Brown, B.W.; Feige, E.J.; Galbraith, S.G. & Porter, A.M. Technical evaluation report on the Third 10-year Interval Inservice Inspection Program Plan: Florida Power and Light Company, Turkey Point Nuclear Power Plant, Units 3 and 4 (Docket Numbers 50-250 and 50-251), report, February 1, 1995; Idaho Falls, Idaho. (digital.library.unt.edu/ark:/67531/metadc676539/: accessed October 17, 2018), University of North Texas Libraries, Digital Library, digital.library.unt.edu; crediting UNT Libraries Government Documents Department.