Data quality objectives for TWRS privatization Phase 1: Confirm tank T is an appropriate feed source for low-activity waste feed batch X

PDF Version Also Available for Download.

Description

The Phase 1 privatization contracts require that the Project Hanford Management Contract (PHMC) contractors, on behalf of the US Department of Energy, Richland Operations Office (RL), deliver the appropriate quantities of the proper composition of feed on schedule to the Privatization contractors (DOE-RL 1996). The type of feed needed, the amount of feed needed, and the overall timing of when feed is to be delivered to the Privatization contractor are specified by the contract. Additional requirements are imposed by the interface control document (ICD) for low-activity waste (LAW) feed (PHMC 1997a). The Tank Waste Remediation System Operation and Utilization Plan ... continued below

Physical Description

33 p.

Creation Information

Certa, P.J. July 2, 1998.

Context

This report is part of the collection entitled: Office of Scientific & Technical Information Technical Reports and was provided by UNT Libraries Government Documents Department to Digital Library, a digital repository hosted by the UNT Libraries. More information about this report can be viewed below.

Who

People and organizations associated with either the creation of this report or its content.

Author

Sponsors

Publisher

  • Fluor Daniel Hanford, Inc.
    Publisher Info: Fluor Daniel Hanford, Inc., Richland, WA (United States)
    Place of Publication: Richland, Washington

Provided By

UNT Libraries Government Documents Department

Serving as both a federal and a state depository library, the UNT Libraries Government Documents Department maintains millions of items in a variety of formats. The department is a member of the FDLP Content Partnerships Program and an Affiliated Archive of the National Archives.

Contact Us

What

Descriptive information to help identify this report. Follow the links below to find similar items on the Digital Library.

Description

The Phase 1 privatization contracts require that the Project Hanford Management Contract (PHMC) contractors, on behalf of the US Department of Energy, Richland Operations Office (RL), deliver the appropriate quantities of the proper composition of feed on schedule to the Privatization contractors (DOE-RL 1996). The type of feed needed, the amount of feed needed, and the overall timing of when feed is to be delivered to the Privatization contractor are specified by the contract. Additional requirements are imposed by the interface control document (ICD) for low-activity waste (LAW) feed (PHMC 1997a). The Tank Waste Remediation System Operation and Utilization Plan (TWRSO/UP) as updated by the Readiness-to-Proceed (RTP) deliverable establishes the baseline operating scenario for the delivery of feed to two Privatization contractors for the first twelve LAW batches. The project master baseline schedule (PMBS) and corresponding logic diagrams that will be used to implement the operating scenario have been developed and are currently being refined. The baseline operating scenario in the TWRSO/UP/RTP specifies which tanks will be used to provide feed for each specific feed batch, the operational activities needed to prepare and deliver each feed batch, and the timing of these activities. This operating scenario has considered such factors as the privatization contracts and ICD requirements, waste composition and chemistry, equipment availability, project schedules and funding, tank farm logistics and the availability of tank space. The PMBS includes activities to reduce programmatic risk.

Physical Description

33 p.

Notes

INIS; OSTI as DE99050824

Source

  • Other Information: PBD: 2 Jul 1998

Language

Item Type

Identifier

Unique identifying numbers for this report in the Digital Library or other systems.

  • Other: DE99050824
  • Report No.: HNF--1796-Rev.1
  • Grant Number: AC06-96RL13200
  • DOI: 10.2172/341268 | External Link
  • Office of Scientific & Technical Information Report Number: 341268
  • Archival Resource Key: ark:/67531/metadc676448

Collections

This report is part of the following collection of related materials.

Office of Scientific & Technical Information Technical Reports

Reports, articles and other documents harvested from the Office of Scientific and Technical Information.

Office of Scientific and Technical Information (OSTI) is the Department of Energy (DOE) office that collects, preserves, and disseminates DOE-sponsored research and development (R&D) results that are the outcomes of R&D projects or other funded activities at DOE labs and facilities nationwide and grantees at universities and other institutions.

What responsibilities do I have when using this report?

When

Dates and time periods associated with this report.

Creation Date

  • July 2, 1998

Added to The UNT Digital Library

  • July 25, 2015, 2:20 a.m.

Description Last Updated

  • June 14, 2016, 8:28 p.m.

Usage Statistics

When was this report last used?

Yesterday: 0
Past 30 days: 0
Total Uses: 4

Interact With This Report

Here are some suggestions for what to do next.

Start Reading

PDF Version Also Available for Download.

International Image Interoperability Framework

IIF Logo

We support the IIIF Presentation API

Certa, P.J. Data quality objectives for TWRS privatization Phase 1: Confirm tank T is an appropriate feed source for low-activity waste feed batch X, report, July 2, 1998; Richland, Washington. (digital.library.unt.edu/ark:/67531/metadc676448/: accessed October 16, 2018), University of North Texas Libraries, Digital Library, digital.library.unt.edu; crediting UNT Libraries Government Documents Department.