Magnet design concepts for the 100 MeV isotope production facility

PDF Version Also Available for Download.

Description

The North Port Target Facility proposal includes a 100 MeV beam line to be is built at the LANSCE accelerator. In developing cost and schedule estimates for the proposal the greatest uncertainties are associated with the kicker magnet that is needed to divert portions of the beam into the new beam line. This magnet must fit into a rigidly defined space within the transition region of the existing accelerator and must operate in synchrony with the current accelerator operations systems, In addition, it must not degrade the beam qualify when beam is directed to other areas of the complex. Because ... continued below

Physical Description

12 p.

Creation Information

Wadlinger, E.A.; Merrill, F.E. & Power, J.F. October 7, 1996.

Context

This report is part of the collection entitled: Office of Scientific & Technical Information Technical Reports and was provided by UNT Libraries Government Documents Department to Digital Library, a digital repository hosted by the UNT Libraries. More information about this report can be viewed below.

Who

People and organizations associated with either the creation of this report or its content.

Sponsor

Publisher

Provided By

UNT Libraries Government Documents Department

Serving as both a federal and a state depository library, the UNT Libraries Government Documents Department maintains millions of items in a variety of formats. The department is a member of the FDLP Content Partnerships Program and an Affiliated Archive of the National Archives.

Contact Us

What

Descriptive information to help identify this report. Follow the links below to find similar items on the Digital Library.

Description

The North Port Target Facility proposal includes a 100 MeV beam line to be is built at the LANSCE accelerator. In developing cost and schedule estimates for the proposal the greatest uncertainties are associated with the kicker magnet that is needed to divert portions of the beam into the new beam line. This magnet must fit into a rigidly defined space within the transition region of the existing accelerator and must operate in synchrony with the current accelerator operations systems, In addition, it must not degrade the beam qualify when beam is directed to other areas of the complex. Because of these constraints the magnet must be specifically designed and built for this intended application. We have produced conceptual designs of a kicker-magnet and power supply that will meet all of the design requirements. The power supply design is based on a working design for the RIKI kicker magnet that switches 800 MeV beam into the PSR. This report presents the kicker-magnet and power-supply designs and cost and schedule estimates for incorporation into the EP facility proposal. The feasibility of various design alternatives are briefly discussed.

Physical Description

12 p.

Notes

INIS; OSTI as DE97002319

Source

  • Other Information: PBD: 7 Oct 1996

Language

Item Type

Identifier

Unique identifying numbers for this report in the Digital Library or other systems.

  • Other: DE97002319
  • Report No.: LA-UR--96-3755
  • Grant Number: W-7405-ENG-36
  • DOI: 10.2172/420371 | External Link
  • Office of Scientific & Technical Information Report Number: 420371
  • Archival Resource Key: ark:/67531/metadc675770

Collections

This report is part of the following collection of related materials.

Office of Scientific & Technical Information Technical Reports

Reports, articles and other documents harvested from the Office of Scientific and Technical Information.

Office of Scientific and Technical Information (OSTI) is the Department of Energy (DOE) office that collects, preserves, and disseminates DOE-sponsored research and development (R&D) results that are the outcomes of R&D projects or other funded activities at DOE labs and facilities nationwide and grantees at universities and other institutions.

What responsibilities do I have when using this report?

When

Dates and time periods associated with this report.

Creation Date

  • October 7, 1996

Added to The UNT Digital Library

  • July 25, 2015, 2:20 a.m.

Description Last Updated

  • May 20, 2016, 1:29 p.m.

Usage Statistics

When was this report last used?

Yesterday: 0
Past 30 days: 0
Total Uses: 3

Interact With This Report

Here are some suggestions for what to do next.

Start Reading

PDF Version Also Available for Download.

International Image Interoperability Framework

IIF Logo

We support the IIIF Presentation API

Wadlinger, E.A.; Merrill, F.E. & Power, J.F. Magnet design concepts for the 100 MeV isotope production facility, report, October 7, 1996; New Mexico. (digital.library.unt.edu/ark:/67531/metadc675770/: accessed June 24, 2018), University of North Texas Libraries, Digital Library, digital.library.unt.edu; crediting UNT Libraries Government Documents Department.