Electric Power Research Institute: Environmental Control Technology Center. Report to the Steering Committee, November 1995. Final technical report

PDF Version Also Available for Download.

Description

Operations and maintenance continued this month at the Electric Power Research Institute`s Environmental Control Technology Center. Testing on the 4.0 MW Pilot Wet FGD unit continued this month with the Pilot High Velocity (PHV) and the Trace Element Removal (TER) test blocks. In the High Velocity test block, SO{sub 2} removal and mist eliminator carryover rates were investigated while operating the absorber unit with various spray nozzle types and vertical mist eliminator sections. During the Trace Element Removal test block, the mercury measurement studies involving the EPA Draft Method 29 continued with testing of several impinger solutions. The 4.0 MW ... continued below

Physical Description

Medium: P; Size: 157 p.

Creation Information

Creator: Unknown. November 1, 1995.

Context

This report is part of the collection entitled: Office of Scientific & Technical Information Technical Reports and was provided by UNT Libraries Government Documents Department to Digital Library, a digital repository hosted by the UNT Libraries. It has been viewed 17 times . More information about this report can be viewed below.

Who

People and organizations associated with either the creation of this report or its content.

Creator

  • We've been unable to identify the creator(s) of this report.

Sponsor

Provided By

UNT Libraries Government Documents Department

Serving as both a federal and a state depository library, the UNT Libraries Government Documents Department maintains millions of items in a variety of formats. The department is a member of the FDLP Content Partnerships Program and an Affiliated Archive of the National Archives.

Contact Us

What

Descriptive information to help identify this report. Follow the links below to find similar items on the Digital Library.

Description

Operations and maintenance continued this month at the Electric Power Research Institute`s Environmental Control Technology Center. Testing on the 4.0 MW Pilot Wet FGD unit continued this month with the Pilot High Velocity (PHV) and the Trace Element Removal (TER) test blocks. In the High Velocity test block, SO{sub 2} removal and mist eliminator carryover rates were investigated while operating the absorber unit with various spray nozzle types and vertical mist eliminator sections. During the Trace Element Removal test block, the mercury measurement studies involving the EPA Draft Method 29 continued with testing of several impinger solutions. The 4.0 MW Spray Dryer Absorber system was utilized in the TER test configuration this month while the 1.0 MW Cold-Side Selective Catalytic Reduction (SCR) unit and the 0.4 MW Mini-Pilot Absorber unit remained in a state of cold-standby. A monthly inspection was conducted for all equipment in cold-standby, as well as for the fire safety systems in the SCR building. These inspections will continue to be conducted by the ECTC Operations and Maintenance staff each month.

Physical Description

Medium: P; Size: 157 p.

Notes

OSTI as TI96050464

Source

  • Other Information: PBD: Nov 1995

Language

Item Type

Identifier

Unique identifying numbers for this report in the Digital Library or other systems.

  • Other: TI96050464
  • Report No.: DOE/PC/93256--T24
  • Grant Number: FG22-94PC93256
  • DOI: 10.2172/375906 | External Link
  • Office of Scientific & Technical Information Report Number: 375906
  • Archival Resource Key: ark:/67531/metadc674603

Collections

This report is part of the following collection of related materials.

Office of Scientific & Technical Information Technical Reports

Reports, articles and other documents harvested from the Office of Scientific and Technical Information.

Office of Scientific and Technical Information (OSTI) is the Department of Energy (DOE) office that collects, preserves, and disseminates DOE-sponsored research and development (R&D) results that are the outcomes of R&D projects or other funded activities at DOE labs and facilities nationwide and grantees at universities and other institutions.

What responsibilities do I have when using this report?

When

Dates and time periods associated with this report.

Creation Date

  • November 1, 1995

Added to The UNT Digital Library

  • July 25, 2015, 2:20 a.m.

Description Last Updated

  • Dec. 7, 2015, 2:55 p.m.

Usage Statistics

When was this report last used?

Yesterday: 0
Past 30 days: 0
Total Uses: 17

Interact With This Report

Here are some suggestions for what to do next.

Start Reading

PDF Version Also Available for Download.

Citations, Rights, Re-Use

Electric Power Research Institute: Environmental Control Technology Center. Report to the Steering Committee, November 1995. Final technical report, report, November 1, 1995; United States. (digital.library.unt.edu/ark:/67531/metadc674603/: accessed April 27, 2018), University of North Texas Libraries, Digital Library, digital.library.unt.edu; crediting UNT Libraries Government Documents Department.