Development and testing of industrial scale, coal fired combustion system, Phase 3. Sixteenth quarterly technical progress report, October 1--December 31, 1995

PDF Version Also Available for Download.

Description

In the fourth quarter of calendar year 1995 the installation and checkout of the 20 MMBtu/hr combustor and auxiliary equipment in Philadelphia was completed. The task 5, Site Demonstration Testing, combustor-boiler tests on gas, oil, and coal were initiated. The task 5 effort involves testing the combustor over extended periods under conditions that fully simulate commercial operation and that meet the combustion and environmental specifications for this project. To meet this project objective within the current work scope requires up to 500 hours of testing. The focus of this testing will be on the component and environmental performance of combustor, ... continued below

Physical Description

18 p.

Creation Information

Zauderer, B. January 3, 1996.

Context

This report is part of the collection entitled: Office of Scientific & Technical Information Technical Reports and was provided by UNT Libraries Government Documents Department to Digital Library, a digital repository hosted by the UNT Libraries. It has been viewed 11 times . More information about this report can be viewed below.

Who

People and organizations associated with either the creation of this report or its content.

Author

Sponsor

Publisher

Provided By

UNT Libraries Government Documents Department

Serving as both a federal and a state depository library, the UNT Libraries Government Documents Department maintains millions of items in a variety of formats. The department is a member of the FDLP Content Partnerships Program and an Affiliated Archive of the National Archives.

Contact Us

What

Descriptive information to help identify this report. Follow the links below to find similar items on the Digital Library.

Description

In the fourth quarter of calendar year 1995 the installation and checkout of the 20 MMBtu/hr combustor and auxiliary equipment in Philadelphia was completed. The task 5, Site Demonstration Testing, combustor-boiler tests on gas, oil, and coal were initiated. The task 5 effort involves testing the combustor over extended periods under conditions that fully simulate commercial operation and that meet the combustion and environmental specifications for this project. To meet this project objective within the current work scope requires up to 500 hours of testing. The focus of this testing will be on the component and environmental performance of combustor, boiler, coal preparation and feeding, and the stack gas equipment. The facility can be converted to a 500 kW power plant by the addition of a steam turbine, condenser, and cooling tower. However, this added effort is beyond the current work scope and its implementation will depend on recovering the added costs by placing the steam production from the boiler to beneficial use. During the present quarterly reporting period, all the components needed to implement the initial 100 hours of testing under task 5 were installed at the test site, and checkout of this equipment was performed. Since the present installation contained substantial improvements and simplifications to all sub-systems that had been used in the Williamsport facility, each component and sub-system had to be tested individually.

Physical Description

18 p.

Notes

OSTI as DE96012571

Source

  • Other Information: PBD: 3 Jan 1996

Language

Item Type

Identifier

Unique identifying numbers for this report in the Digital Library or other systems.

  • Other: DE96012571
  • Report No.: DOE/PC/91162--T16
  • Grant Number: AC22-91PC91162
  • DOI: 10.2172/257340 | External Link
  • Office of Scientific & Technical Information Report Number: 257340
  • Archival Resource Key: ark:/67531/metadc671431

Collections

This report is part of the following collection of related materials.

Office of Scientific & Technical Information Technical Reports

Reports, articles and other documents harvested from the Office of Scientific and Technical Information.

Office of Scientific and Technical Information (OSTI) is the Department of Energy (DOE) office that collects, preserves, and disseminates DOE-sponsored research and development (R&D) results that are the outcomes of R&D projects or other funded activities at DOE labs and facilities nationwide and grantees at universities and other institutions.

What responsibilities do I have when using this report?

When

Dates and time periods associated with this report.

Creation Date

  • January 3, 1996

Added to The UNT Digital Library

  • June 29, 2015, 9:42 p.m.

Description Last Updated

  • Nov. 19, 2015, 8:33 p.m.

Usage Statistics

When was this report last used?

Yesterday: 0
Past 30 days: 0
Total Uses: 11

Interact With This Report

Here are some suggestions for what to do next.

Start Reading

PDF Version Also Available for Download.

International Image Interoperability Framework

IIF Logo

We support the IIIF Presentation API

Zauderer, B. Development and testing of industrial scale, coal fired combustion system, Phase 3. Sixteenth quarterly technical progress report, October 1--December 31, 1995, report, January 3, 1996; United States. (digital.library.unt.edu/ark:/67531/metadc671431/: accessed July 18, 2018), University of North Texas Libraries, Digital Library, digital.library.unt.edu; crediting UNT Libraries Government Documents Department.