The mixed waste management facility. Monthly report, September 1995

PDF Version Also Available for Download.

Description

A continuing concern over the last few months was resolved with the approval of the Environmental Assessment (EA) and signing of the Finding of No Significant Impact (FONSI). This was completed in time to allow approval of the DWTF Phase 1 KD-3 and subsequent award of the construction contract for this phase (site preparation). The Project continues to make progress toward the Project Preliminary Design Review (PDR), scheduled for November 15-16, 1995. We completed the conventional feed preparation and solid feed preparation demonstration technologies (telerobotic sorting) and conducted a prereview of the Analytical Services element. Molten Salt is scheduled for ... continued below

Physical Description

47 p.

Creation Information

Streit, R.D. October 1, 1995.

Context

This report is part of the collection entitled: Office of Scientific & Technical Information Technical Reports and was provided by UNT Libraries Government Documents Department to Digital Library, a digital repository hosted by the UNT Libraries. More information about this report can be viewed below.

Who

People and organizations associated with either the creation of this report or its content.

Author

Sponsor

Publisher

Provided By

UNT Libraries Government Documents Department

Serving as both a federal and a state depository library, the UNT Libraries Government Documents Department maintains millions of items in a variety of formats. The department is a member of the FDLP Content Partnerships Program and an Affiliated Archive of the National Archives.

Contact Us

What

Descriptive information to help identify this report. Follow the links below to find similar items on the Digital Library.

Description

A continuing concern over the last few months was resolved with the approval of the Environmental Assessment (EA) and signing of the Finding of No Significant Impact (FONSI). This was completed in time to allow approval of the DWTF Phase 1 KD-3 and subsequent award of the construction contract for this phase (site preparation). The Project continues to make progress toward the Project Preliminary Design Review (PDR), scheduled for November 15-16, 1995. We completed the conventional feed preparation and solid feed preparation demonstration technologies (telerobotic sorting) and conducted a prereview of the Analytical Services element. Molten Salt is scheduled for October 3-4, with Water Treatment and Analytical Services completing the reviews by October 12. While a number of design issues have been raised and are being tracked, the general level of engineering progress is consistent with completing the PDR on schedule. No show-stoppers have been identified, and all items requiring resolution before PDR will be competed.

Physical Description

47 p.

Notes

INIS; OSTI as DE96003720

Source

  • Other Information: PBD: Oct 1995

Language

Item Type

Identifier

Unique identifying numbers for this report in the Digital Library or other systems.

  • Other: DE96003720
  • Report No.: UCRL-ID--116187-95-9
  • Grant Number: W-7405-ENG-48
  • DOI: 10.2172/176764 | External Link
  • Office of Scientific & Technical Information Report Number: 176764
  • Archival Resource Key: ark:/67531/metadc669428

Collections

This report is part of the following collection of related materials.

Office of Scientific & Technical Information Technical Reports

Reports, articles and other documents harvested from the Office of Scientific and Technical Information.

Office of Scientific and Technical Information (OSTI) is the Department of Energy (DOE) office that collects, preserves, and disseminates DOE-sponsored research and development (R&D) results that are the outcomes of R&D projects or other funded activities at DOE labs and facilities nationwide and grantees at universities and other institutions.

What responsibilities do I have when using this report?

When

Dates and time periods associated with this report.

Creation Date

  • October 1, 1995

Added to The UNT Digital Library

  • June 29, 2015, 9:42 p.m.

Description Last Updated

  • Feb. 23, 2016, 6:49 p.m.

Usage Statistics

When was this report last used?

Yesterday: 0
Past 30 days: 0
Total Uses: 3

Interact With This Report

Here are some suggestions for what to do next.

Start Reading

PDF Version Also Available for Download.

International Image Interoperability Framework

IIF Logo

We support the IIIF Presentation API

Streit, R.D. The mixed waste management facility. Monthly report, September 1995, report, October 1, 1995; California. (digital.library.unt.edu/ark:/67531/metadc669428/: accessed May 24, 2018), University of North Texas Libraries, Digital Library, digital.library.unt.edu; crediting UNT Libraries Government Documents Department.