Toxics Release Inventory Expansion Rule Phase 3 (TRI-P3)

PDF Version Also Available for Download.

Description

The ORR [East Tennessee Technology Park (ETTP), Y-12 Plant, and Oak Ridge National Laboratory (ORNL)] is considered a single facility for reporting by the DOE prime contractors. The processing, manufacturing, or "otherwise use" Section313 chemicals are combined to determine TRI reportability. Such is the case with lead metal, which is one of two chemicals for which reportin~ forms were prepared in this pilot study (Task 2;1. The lead shop at ORNL exceeded the reporting threshold, causing a lead activity at a Y-1 2 machine shop and lead in waste at ETTP to be reportable. TRI-P3 report preparation time for lead ... continued below

Physical Description

Pages

Creation Information

Evans, R.A.; Saunders, A.D. & Worley, G.G. September 1, 1998.

Context

This report is part of the collection entitled: Office of Scientific & Technical Information Technical Reports and was provided by UNT Libraries Government Documents Department to Digital Library, a digital repository hosted by the UNT Libraries. It has been viewed 12 times . More information about this report can be viewed below.

Who

People and organizations associated with either the creation of this report or its content.

Publisher

Provided By

UNT Libraries Government Documents Department

Serving as both a federal and a state depository library, the UNT Libraries Government Documents Department maintains millions of items in a variety of formats. The department is a member of the FDLP Content Partnerships Program and an Affiliated Archive of the National Archives.

Contact Us

What

Descriptive information to help identify this report. Follow the links below to find similar items on the Digital Library.

Description

The ORR [East Tennessee Technology Park (ETTP), Y-12 Plant, and Oak Ridge National Laboratory (ORNL)] is considered a single facility for reporting by the DOE prime contractors. The processing, manufacturing, or "otherwise use" Section313 chemicals are combined to determine TRI reportability. Such is the case with lead metal, which is one of two chemicals for which reportin~ forms were prepared in this pilot study (Task 2;1. The lead shop at ORNL exceeded the reporting threshold, causing a lead activity at a Y-1 2 machine shop and lead in waste at ETTP to be reportable. TRI-P3 report preparation time for lead totaled 36.5 hours. The second chemical investigated and reported (chromium) also required nearly a man-week for report preparation and documentation by experienced TRI personnel. The ORR TRI report typically includes about six chemicals, so an estimate of the TRI-P3 incremental reporting burden for ORR would be six weeks for experienced personnel axI d two/three man-months for first-time ORR preparers.

Physical Description

Pages

Language

Item Type

Identifier

Unique identifying numbers for this report in the Digital Library or other systems.

  • Other: DE00001839
  • Report No.: Y/TS-1732
  • Grant Number: NONE
  • DOI: 10.2172/1839 | External Link
  • Office of Scientific & Technical Information Report Number: 1839
  • Archival Resource Key: ark:/67531/metadc668669

Collections

This report is part of the following collection of related materials.

Office of Scientific & Technical Information Technical Reports

Reports, articles and other documents harvested from the Office of Scientific and Technical Information.

Office of Scientific and Technical Information (OSTI) is the Department of Energy (DOE) office that collects, preserves, and disseminates DOE-sponsored research and development (R&D) results that are the outcomes of R&D projects or other funded activities at DOE labs and facilities nationwide and grantees at universities and other institutions.

What responsibilities do I have when using this report?

When

Dates and time periods associated with this report.

Creation Date

  • September 1, 1998

Added to The UNT Digital Library

  • June 29, 2015, 9:42 p.m.

Description Last Updated

  • Jan. 2, 2018, 6:30 p.m.

Usage Statistics

When was this report last used?

Yesterday: 0
Past 30 days: 1
Total Uses: 12

Interact With This Report

Here are some suggestions for what to do next.

Start Reading

PDF Version Also Available for Download.

Citations, Rights, Re-Use

Evans, R.A.; Saunders, A.D. & Worley, G.G. Toxics Release Inventory Expansion Rule Phase 3 (TRI-P3), report, September 1, 1998; Oak Ridge, Tennessee. (digital.library.unt.edu/ark:/67531/metadc668669/: accessed April 21, 2018), University of North Texas Libraries, Digital Library, digital.library.unt.edu; crediting UNT Libraries Government Documents Department.