Cassini RTG Program. Monthly technical progress report, October 30--November 26, 1995

PDF Version Also Available for Download.

Description

The technical progress achieved during the period 30 October through 26 November, 1995 is described herein. This report is organized by program task structure: (1) spacecraft integration and liaison; (2) engineering support; (3) safety; (4) qualified unicouple production; (5) ETG fabrication, assembly, and test; (6) ground support equipment (GSE); (7) RTG shipping and launch support; (8) designs, reviews, and mission applications; (9) project management, quality assurance, reliability, contract changes, CAGO acquisition (operating funds), and GACO maintenance and repair; and CAGO acquisition (capital funds).

Physical Description

28 p.

Creation Information

Creator: Unknown. December 24, 1995.

Context

This report is part of the collection entitled: Office of Scientific & Technical Information Technical Reports and was provided by UNT Libraries Government Documents Department to Digital Library, a digital repository hosted by the UNT Libraries. More information about this report can be viewed below.

Who

People and organizations associated with either the creation of this report or its content.

Creator

  • We've been unable to identify the creator(s) of this report.

Sponsor

Publisher

Provided By

UNT Libraries Government Documents Department

Serving as both a federal and a state depository library, the UNT Libraries Government Documents Department maintains millions of items in a variety of formats. The department is a member of the FDLP Content Partnerships Program and an Affiliated Archive of the National Archives.

Contact Us

What

Descriptive information to help identify this report. Follow the links below to find similar items on the Digital Library.

Description

The technical progress achieved during the period 30 October through 26 November, 1995 is described herein. This report is organized by program task structure: (1) spacecraft integration and liaison; (2) engineering support; (3) safety; (4) qualified unicouple production; (5) ETG fabrication, assembly, and test; (6) ground support equipment (GSE); (7) RTG shipping and launch support; (8) designs, reviews, and mission applications; (9) project management, quality assurance, reliability, contract changes, CAGO acquisition (operating funds), and GACO maintenance and repair; and CAGO acquisition (capital funds).

Physical Description

28 p.

Notes

OSTI as DE96003902

Source

  • Other Information: PBD: 24 Dec 1995

Language

Item Type

Identifier

Unique identifying numbers for this report in the Digital Library or other systems.

  • Other: DE96003902
  • Report No.: DOE/SF/18852--T57
  • Grant Number: AC03-91SF18852
  • DOI: 10.2172/171340 | External Link
  • Office of Scientific & Technical Information Report Number: 171340
  • Archival Resource Key: ark:/67531/metadc668002

Collections

This report is part of the following collection of related materials.

Office of Scientific & Technical Information Technical Reports

What responsibilities do I have when using this report?

When

Dates and time periods associated with this report.

Creation Date

  • December 24, 1995

Added to The UNT Digital Library

  • June 29, 2015, 9:42 p.m.

Description Last Updated

  • Nov. 19, 2015, 12:02 p.m.

Usage Statistics

When was this report last used?

Yesterday: 0
Past 30 days: 1
Total Uses: 3

Interact With This Report

Here are some suggestions for what to do next.

Start Reading

PDF Version Also Available for Download.

Citations, Rights, Re-Use

Cassini RTG Program. Monthly technical progress report, October 30--November 26, 1995, report, December 24, 1995; United States. (digital.library.unt.edu/ark:/67531/metadc668002/: accessed September 19, 2017), University of North Texas Libraries, Digital Library, digital.library.unt.edu; crediting UNT Libraries Government Documents Department.