The following text was automatically extracted from the image on this page using optical character recognition software:
Task 3.1 - Test Facilities Task 3.1.1 Test Facility and Support System Design/Construction: High Pressure Air Supply System: Final designs for the piping and supports were completed. The internal insulation materials were received and fabrication initiated. Design of the liners for the double-walled piping section were completed. The liner material was received and fabrication initiated. Combustion Air System: The internal insulation for the combustion air system was received. Design for the Bypass piping section was completed and fabrication initiated. The combustion air system control valves were received and installation initiated. Exhaust Breeching: Materials for the expansion joint between the HRSG breeching and the ID fan was received and installation initiated. ID Fan: Design for the support of the ID fan was completed. Fabrication and installation of the ID Fan and ID Fan support was completed. Checkout operation of the ID Fan was also completed. Controls & Instrumentation: Installation of the control system for the "dry-out" tests have been completed. Designs and specifications of the data acquisition system is nearing completion. CerHx Tube-String Assembly: Assembly of the MIET was initiated and is approximately 50% complete. The assembly procedure includes pressure testing (up to 15 psig) the individual tube strings as each individual assembly is completed. Task 3.2 - Testing and Analysis Task 3.2.1 Systems Test: Integrated Test Plan: Initial checkout and "dry-out" tests will be performed during the next quarter. The dry-out procedures and required temperature schedules for proper refractory dry-out are in the process of being developed. The detailed test procedures for these initial tests will be completed and submitted to DOE during the next quarter. DISCLAIMER This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsi- bility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Refer- ence herein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise does not necessarily constitute or imply its endorsement, recom- mendation, or favoring by the United States Government or any agency thereof. The views and opinions of authors expressed herein do not necessarily state or reflect those of the United States Government or any agency thereof. 4
High-pressure coal-fired ceramic air heater for gas turbine applications. Technical quarterly progress report, May 1994--July 1994,
report,
February 1, 1996;
United States.
(https://digital.library.unt.edu/ark:/67531/metadc666703/m1/4/:
accessed April 18, 2024),
University of North Texas Libraries, UNT Digital Library, https://digital.library.unt.edu;
crediting UNT Libraries Government Documents Department.