[Western Coal Study]. Mound Laboratory-USEPA Interagency Agreement IAG-D5-E681: Progress report number 1, July 12--August 13, 1976

PDF Version Also Available for Download.

Description

Major accomplishments during the first five weeks of this study include: (1) successful adaption of analytical methods; (2) preparation of detailed operational sheets; (3) selection of mines to be sampled, through USGS and various state geologists; and (4) successful completion of coal mine sampling. Complete operational sheets have been prepared which include steps taken from collection of the sample at the mine through counting of that sample for radioactivity. The purpose of these operational sheets is to bring consistency to all the data and traceability of a sample result back through the operational sheets to the mine and day it ... continued below

Physical Description

14 p.

Creation Information

Creator: Unknown. December 31, 1976.

Context

This report is part of the collection entitled: Office of Scientific & Technical Information Technical Reports and was provided by UNT Libraries Government Documents Department to Digital Library, a digital repository hosted by the UNT Libraries. It has been viewed 18 times . More information about this report can be viewed below.

Who

People and organizations associated with either the creation of this report or its content.

Creator

  • We've been unable to identify the creator(s) of this report.

Sponsor

Publisher

  • Mound Plant (U.S.)
    Publisher Info: Mound Lab., Miamisburg, OH (United States)
    Place of Publication: Miamisburg, Ohio

Provided By

UNT Libraries Government Documents Department

Serving as both a federal and a state depository library, the UNT Libraries Government Documents Department maintains millions of items in a variety of formats. The department is a member of the FDLP Content Partnerships Program and an Affiliated Archive of the National Archives.

Contact Us

What

Descriptive information to help identify this report. Follow the links below to find similar items on the Digital Library.

Description

Major accomplishments during the first five weeks of this study include: (1) successful adaption of analytical methods; (2) preparation of detailed operational sheets; (3) selection of mines to be sampled, through USGS and various state geologists; and (4) successful completion of coal mine sampling. Complete operational sheets have been prepared which include steps taken from collection of the sample at the mine through counting of that sample for radioactivity. The purpose of these operational sheets is to bring consistency to all the data and traceability of a sample result back through the operational sheets to the mine and day it was sampled.

Physical Description

14 p.

Notes

OSTI as DE96012362

Source

  • Other Information: PBD: [1976]

Language

Item Type

Identifier

Unique identifying numbers for this report in the Digital Library or other systems.

  • Other: DE96012362
  • Report No.: MLM-MU--76-68-0002
  • Grant Number: AC04-76DP00053
  • DOI: 10.2172/266613 | External Link
  • Office of Scientific & Technical Information Report Number: 266613
  • Archival Resource Key: ark:/67531/metadc665902

Collections

This report is part of the following collection of related materials.

Office of Scientific & Technical Information Technical Reports

Reports, articles and other documents harvested from the Office of Scientific and Technical Information.

Office of Scientific and Technical Information (OSTI) is the Department of Energy (DOE) office that collects, preserves, and disseminates DOE-sponsored research and development (R&D) results that are the outcomes of R&D projects or other funded activities at DOE labs and facilities nationwide and grantees at universities and other institutions.

What responsibilities do I have when using this report?

When

Dates and time periods associated with this report.

Creation Date

  • December 31, 1976

Added to The UNT Digital Library

  • June 29, 2015, 9:42 p.m.

Description Last Updated

  • Feb. 17, 2017, 3:41 p.m.

Usage Statistics

When was this report last used?

Yesterday: 0
Past 30 days: 1
Total Uses: 18

Interact With This Report

Here are some suggestions for what to do next.

Start Reading

PDF Version Also Available for Download.

International Image Interoperability Framework

IIF Logo

We support the IIIF Presentation API

[Western Coal Study]. Mound Laboratory-USEPA Interagency Agreement IAG-D5-E681: Progress report number 1, July 12--August 13, 1976, report, December 31, 1976; Miamisburg, Ohio. (digital.library.unt.edu/ark:/67531/metadc665902/: accessed July 18, 2018), University of North Texas Libraries, Digital Library, digital.library.unt.edu; crediting UNT Libraries Government Documents Department.