Preliminary analysis of tank 241-C-106 dryout due to large postulated leak and vaporization Metadata

Metadata describes a digital item, providing (if known) such information as creator, publisher, contents, size, relationship to other resources, and more. Metadata may also contain "preservation" components that help us to maintain the integrity of digital files over time.

Title

  • Main Title Preliminary analysis of tank 241-C-106 dryout due to large postulated leak and vaporization

Creator

  • Author: Piepho, M. G.
    Creator Type: Personal

Contributor

  • Sponsor: United States. Department of Energy.
    Contributor Type: Organization
    Contributor Info: USDOE, Washington, DC (United States)

Publisher

  • Name: Westinghouse Hanford Company
    Place of Publication: Richland, Washington
    Additional Info: Westinghouse Hanford Co., Richland, WA (United States)

Date

  • Creation: 1994-12-01

Language

  • English

Description

  • Content Description: This analysis assumes that there is a hypothetical large leak at the bottom of Tank 241-C-106 which initiates the dryout of the tank. The time required for a tank to dryout after a leak is of interest for safety reasons. As a tank dries out, its temperature is expected to increase which could affect the structural integrity of the concrete tank dome. Hence, it is of interest to know how fast and how high the temperature in a leaky tank increases, so that mitigation procedures can be planned and implemented in a timely manner. This analysis is focused on tank 241-C-106, which is known to be high thermal tank. The objective of the study was to determine how long it would take for tank 241-C-106 to reach 350 degrees Fahrenheit (about 177 degrees Centigrade) after a postulated large leak develops at the bottom center of the tank. The temperature of 350 degrees Fahrenheit is the minimum temperature that can cause structural damage to concrete (ACI 1992). The postulated leak at the bottom of the tank and the resulting dryout of the sludge in the tank make this analysis different from previous thermal analyses of the C-106 tank and other tanks, especially the double-shell tanks which are mostly liquid.
  • Physical Description: 32 p.

Subject

  • Keyword: Radioactive Waste Disposal
  • Keyword: Dryout
  • Keyword: Radioactive Wastes
  • STI Subject Categories: 05 Nuclear Fuels
  • Keyword: Mitigation
  • Keyword: Leaks
  • Keyword: Tanks
  • Keyword: Thermal Analysis
  • Keyword: Failure Mode Analysis

Source

  • Other Information: PBD: Dec 1994

Collection

  • Name: Office of Scientific & Technical Information Technical Reports
    Code: OSTI

Institution

  • Name: UNT Libraries Government Documents Department
    Code: UNTGD

Resource Type

  • Report

Format

  • Text

Identifier

  • Other: DE95005600
  • Report No.: WHC-EP--0831
  • Grant Number: AC06-87RL10930
  • DOI: 10.2172/26548
  • Office of Scientific & Technical Information Report Number: 26548
  • Archival Resource Key: ark:/67531/metadc664364

Note

  • Display Note: INIS; OSTI as DE95005600
Back to Top of Screen