CONTENTS
Page
Part I.-Construction of tunnel_ -__ _ __ ----------- 1
Introduction------------------------------------------ 1
Acknowledgments 1-------------------------------------------- 1
Organization_ 2------------------------------------------------ 2
Cost of construction---_------------------------------------- 2
Operating specifications for construction of Wawona Tunnel------- 2
Size of operation_------------------------------------- 5
Design of tunnel 6----------------------------------------- 6
Surface plant and equipment_______--- --------------------- 6
Underground equipment and haulage------------------- 7
Drilling and blasting__--------------------------------- 8
Ventilation and gas_ 10
Supervision, general safety practices, and accident prevention___ 12
Industrial insurance and medical service---------- ---------- 12
Concrete lining and paving -__ ___------------------- 13
Accident experience and costs----------------------------- 14
Discussion of accident occurrence and costs ------------------ 17
Part II.-Ventilation of Wawona Tunnel for public use _ 19
Basis of ventilation ------------------------------------------20
Ventilation system--------------------------------------- ---22
Effect of size of ventilating adit on ventilating problem ------------- 23
Vehicular traffic --------------------------------------------25
Natural ventilation_ 25
Fan equipment --------------------------------- 26
Fan operation under traffic conditions---------------------- 28
Power supply and automatic control -----------------------------29
Carbon monoxide analyzers and recorders -------------------------32
Lighting system --------------------------------------------33
Safety features------- -------------------- --------------- 33
ILLUSTRATIONS
Fig.
1. Cost segregations, Wawona Tunnel, Yosemite National Park------- 3
2. Tunnel and gallery sections, Wawona Tunnel--------------------- 6
3. View of tunnel location--6-----
4. Surface plant at time of construction at east portal_ _ _ _ _ 7
5. Storage-battery locomotive and loading bins for muck storage and
distribution7---------------------------------------------- 7
6. Track arrangements underground in main-line section------------- 8
7. Track arrangement in face region_-_____ - --_______-_______- 8
8. Drilling set-up with curved bars for supporting drills for side and
bench drilling--------------------------------------------- 9
9. Drilling set-up for drilling from main horizontal bars-------------- 9
10. Preliminary wiring for lighting and blasting ---------------------- 10
11. Track arrangements at portal, with Root positive-pressure blower
set-up --- ------- ----- ----------- 11
12. A, Root positive-pressure blower set-up; B, track arrangements at
portal----------------- ---------------------------------10
13. Natural draft, Wawona Tunnel_____________________________ _ 27
14. Ventilating fans, Wawona Tunnel___________ --___________-_ 28
15. Graph of travel and carbon monoxide content in tunnel, June 10 and
11, 1933_ __ _ 29
16. Ventilating fans looking from fan adit toward main bore ----------- 32
17. Switchboard and automatic-control panels at fan control room --. 32
18. Carbon monoxide control analyzers_-------------------------_ 32
19. Lighting effect with all lamps burning --------------------------- 33
20. Tunnel lights with half the lamps in operation _ _ _ 33
21. Semaphore in warning position at west (upper) portal_ 33
]II
Upcoming Pages
Here’s what’s next.
Search Inside
This report can be searched. Note: Results may vary based on the legibility of text within the document.
Tools / Downloads
Get a copy of this page or view the extracted text.
Citing and Sharing
Basic information for referencing this web page. We also provide extended guidance on usage rights, references, copying or embedding.
Reference the current page of this Report.
Ash, S. H. Safety Factors in Construction and Ventilation, Wawona Vehicular Tunnel, Yosemite National Park, California, report, 1940; Washington D.C.. (https://digital.library.unt.edu/ark:/67531/metadc66427/m1/3/: accessed April 18, 2024), University of North Texas Libraries, UNT Digital Library, https://digital.library.unt.edu; crediting UNT Libraries Government Documents Department.