Program status 2. quarter -- FY 1990: Fusion technology development

PDF Version Also Available for Download.

Description

During this period, the ARIES-I blanket design team has concentrated its efforts on preparation of the final report. For the ARIES-II blanket design, two concepts are being evaluated. They are the Li self-cooled and the helium-cooled lithium breeder designs. The scoping design of the second concept has been completed. Varian EIMAC has had two tube failures in trying to assemble the X2274 tetrodes for the tests in Japan. Despite the failures it is still possible for the tubes to be ready as scheduled. Also during this quarter, the joint US/PRC integral experiment on beryllium was completed in March and the ... continued below

Physical Description

18 p.

Creation Information

Creator: Unknown. May 1, 1990.

Context

This report is part of the collection entitled: Office of Scientific & Technical Information Technical Reports and was provided by UNT Libraries Government Documents Department to Digital Library, a digital repository hosted by the UNT Libraries. More information about this report can be viewed below.

Who

People and organizations associated with either the creation of this report or its content.

Creator

  • We've been unable to identify the creator(s) of this report.

Sponsor

Publisher

  • General Atomic Company
    Publisher Info: General Atomics, San Diego, CA (United States)
    Place of Publication: San Diego, California

Provided By

UNT Libraries Government Documents Department

Serving as both a federal and a state depository library, the UNT Libraries Government Documents Department maintains millions of items in a variety of formats. The department is a member of the FDLP Content Partnerships Program and an Affiliated Archive of the National Archives.

Contact Us

What

Descriptive information to help identify this report. Follow the links below to find similar items on the Digital Library.

Description

During this period, the ARIES-I blanket design team has concentrated its efforts on preparation of the final report. For the ARIES-II blanket design, two concepts are being evaluated. They are the Li self-cooled and the helium-cooled lithium breeder designs. The scoping design of the second concept has been completed. Varian EIMAC has had two tube failures in trying to assemble the X2274 tetrodes for the tests in Japan. Despite the failures it is still possible for the tubes to be ready as scheduled. Also during this quarter, the joint US/PRC integral experiment on beryllium was completed in March and the analysis of results has begun. Finally, the final design of DIII-D Divertor Material Exposure System (DiMES) was completed. Preliminary analysis by ANL of DIII-D divertor erosion, using measured plasma conditions, predicts maximum net erosion of 50 {micro}m and maximum net deposition of 23 {micro}m. Measurement by SNL-L of the 12 tiles removed in December 1989 is still pending.

Physical Description

18 p.

Notes

OSTI as DE96012278

Source

  • Other Information: PBD: 1 May 1990

Language

Item Type

Identifier

Unique identifying numbers for this report in the Digital Library or other systems.

  • Other: DE96012278
  • Report No.: GA-C--19572(5/1/90)
  • Grant Number: AC03-89ER52153
  • DOI: 10.2172/257426 | External Link
  • Office of Scientific & Technical Information Report Number: 257426
  • Archival Resource Key: ark:/67531/metadc663990

Collections

This report is part of the following collection of related materials.

Office of Scientific & Technical Information Technical Reports

Reports, articles and other documents harvested from the Office of Scientific and Technical Information.

Office of Scientific and Technical Information (OSTI) is the Department of Energy (DOE) office that collects, preserves, and disseminates DOE-sponsored research and development (R&D) results that are the outcomes of R&D projects or other funded activities at DOE labs and facilities nationwide and grantees at universities and other institutions.

What responsibilities do I have when using this report?

When

Dates and time periods associated with this report.

Creation Date

  • May 1, 1990

Added to The UNT Digital Library

  • June 29, 2015, 9:42 p.m.

Description Last Updated

  • April 18, 2016, 5:46 p.m.

Usage Statistics

When was this report last used?

Yesterday: 0
Past 30 days: 0
Total Uses: 3

Interact With This Report

Here are some suggestions for what to do next.

Start Reading

PDF Version Also Available for Download.

Citations, Rights, Re-Use

Program status 2. quarter -- FY 1990: Fusion technology development, report, May 1, 1990; San Diego, California. (digital.library.unt.edu/ark:/67531/metadc663990/: accessed December 14, 2017), University of North Texas Libraries, Digital Library, digital.library.unt.edu; crediting UNT Libraries Government Documents Department.