The mixed waste management facility. Monthly report, January 1995

PDF Version Also Available for Download.

Description

During January, technical progress continued in general accordance with the MWMF FY95 Plan. Engineering development and design continued in support of preliminary design of MWMF major subsystems. Certain activities are being delayed due to DOE guidance for reduced funding profiles that would not warrant new hiring, early procurements, etc. Peer reviews and system preliminary design reviews are now being scheduled for project elements. We continued pursuing integration of MWMF and DWTF functions maximize cost savings. We also expended considerable engineering effort to provide technical and cost tradeoff information for the FY97 Validation. Management focus during January centered upon addressing the ... continued below

Physical Description

49 p.

Creation Information

Streit, R. February 1, 1995.

Context

This report is part of the collection entitled: Office of Scientific & Technical Information Technical Reports and was provided by UNT Libraries Government Documents Department to Digital Library, a digital repository hosted by the UNT Libraries. More information about this report can be viewed below.

Who

People and organizations associated with either the creation of this report or its content.

Author

Sponsor

Publisher

Provided By

UNT Libraries Government Documents Department

Serving as both a federal and a state depository library, the UNT Libraries Government Documents Department maintains millions of items in a variety of formats. The department is a member of the FDLP Content Partnerships Program and an Affiliated Archive of the National Archives.

Contact Us

What

Descriptive information to help identify this report. Follow the links below to find similar items on the Digital Library.

Description

During January, technical progress continued in general accordance with the MWMF FY95 Plan. Engineering development and design continued in support of preliminary design of MWMF major subsystems. Certain activities are being delayed due to DOE guidance for reduced funding profiles that would not warrant new hiring, early procurements, etc. Peer reviews and system preliminary design reviews are now being scheduled for project elements. We continued pursuing integration of MWMF and DWTF functions maximize cost savings. We also expended considerable engineering effort to provide technical and cost tradeoff information for the FY97 Validation. Management focus during January centered upon addressing the rebaseline for MWMF for FY97 Validation in March, and upon progressing with the RD&D permit. Funding baselines for preparing for FY97 Validation in March were obtained from DOE; based on the baseline, detailed scope, schedule, and budget guidance was issued to the project staff to develop Validation information. For reasons of cost-effectiveness, Validation cost estimates will be based on revised CDR estimates, since bottom-up estimates will be completed in July as part of Preliminary Design. We have directed Significant effort toward meeting the TPC and fiscal year profile costs while still maintaining the essential elements of the project. Final review and editorial changes were completed for the RD&D permit application. Based on the meeting with DTSC in December and revised operational requirements, we held a review of the overall permitting strategy prior to routing for signature approval. A simplified strategy is under review. The revised Environmental Assessment (EA) is ready for release to DOE, but is being held up pending results of the permitting strategy review.

Physical Description

49 p.

Notes

OSTI as DE95017299

Source

  • Other Information: PBD: Feb 1995

Language

Item Type

Identifier

Unique identifying numbers for this report in the Digital Library or other systems.

  • Other: DE95017299
  • Report No.: UCRL-ID--116187-95-1
  • Grant Number: W-7405-ENG-48
  • DOI: 10.2172/104989 | External Link
  • Office of Scientific & Technical Information Report Number: 104989
  • Archival Resource Key: ark:/67531/metadc626593

Collections

This report is part of the following collection of related materials.

Office of Scientific & Technical Information Technical Reports

Reports, articles and other documents harvested from the Office of Scientific and Technical Information.

Office of Scientific and Technical Information (OSTI) is the Department of Energy (DOE) office that collects, preserves, and disseminates DOE-sponsored research and development (R&D) results that are the outcomes of R&D projects or other funded activities at DOE labs and facilities nationwide and grantees at universities and other institutions.

What responsibilities do I have when using this report?

When

Dates and time periods associated with this report.

Creation Date

  • February 1, 1995

Added to The UNT Digital Library

  • June 16, 2015, 7:43 a.m.

Description Last Updated

  • Feb. 23, 2016, 7:12 p.m.

Usage Statistics

When was this report last used?

Yesterday: 0
Past 30 days: 1
Total Uses: 10

Interact With This Report

Here are some suggestions for what to do next.

Start Reading

PDF Version Also Available for Download.

International Image Interoperability Framework

IIF Logo

We support the IIIF Presentation API

Streit, R. The mixed waste management facility. Monthly report, January 1995, report, February 1, 1995; California. (digital.library.unt.edu/ark:/67531/metadc626593/: accessed October 23, 2018), University of North Texas Libraries, Digital Library, digital.library.unt.edu; crediting UNT Libraries Government Documents Department.