TEAM (Technologies Enabling Agile Manufacturing) macro planner requirements guide: Version 1.0

PDF Version Also Available for Download.

Description

The Macro Planner will provide required resource identities, bill of material list, routing sequences and identities of all supporting information to the Shop Floor Control System to enable the actual manufacturing activities. The Macro Planner must also collect manufacturing performance data from the shop floor to effectively measure the plan`s performance. The critical feedback will be evaluated during closure of the business cycle and provide the metrics on cost and quality to the planning function. This document is intended to describe the requirements for a Macro Planner system which supports the above environment. The Macro planner should progress to a ... continued below

Physical Description

31 p.

Creation Information

Creator: Unknown. March 28, 1995.

Context

This report is part of the collection entitled: Office of Scientific & Technical Information Technical Reports and was provided by UNT Libraries Government Documents Department to Digital Library, a digital repository hosted by the UNT Libraries. More information about this report can be viewed below.

Who

People and organizations associated with either the creation of this report or its content.

Creator

  • We've been unable to identify the creator(s) of this report.

Sponsor

Publisher

  • Oak Ridge Y-12 Plant
    Publisher Info: Oak Ridge Y-12 Plant, TN (United States)
    Place of Publication: Tennessee

Provided By

UNT Libraries Government Documents Department

Serving as both a federal and a state depository library, the UNT Libraries Government Documents Department maintains millions of items in a variety of formats. The department is a member of the FDLP Content Partnerships Program and an Affiliated Archive of the National Archives.

Contact Us

What

Descriptive information to help identify this report. Follow the links below to find similar items on the Digital Library.

Description

The Macro Planner will provide required resource identities, bill of material list, routing sequences and identities of all supporting information to the Shop Floor Control System to enable the actual manufacturing activities. The Macro Planner must also collect manufacturing performance data from the shop floor to effectively measure the plan`s performance. The critical feedback will be evaluated during closure of the business cycle and provide the metrics on cost and quality to the planning function. This document is intended to describe the requirements for a Macro Planner system which supports the above environment. The Macro planner should progress to a logically, rule driven processor to automate major portions of the planning cycle. It should do the following: support concurrent product/process design; define a globally optimized manufacturing plan for realization of product; compile a complete manufacturing plan script (routing and operational detail documentation); be based on 3-D CAD models imported via STEP standards; and define an Enterprise Resource Base that maps manufacturing capabilities to component features.

Physical Description

31 p.

Notes

OSTI as DE96003429

Source

  • Other Information: PBD: 28 Mar 1995

Language

Item Type

Identifier

Unique identifying numbers for this report in the Digital Library or other systems.

  • Other: DE96003429
  • Report No.: Y/DX--2289
  • Grant Number: AC05-84OR21400
  • DOI: 10.2172/161469 | External Link
  • Office of Scientific & Technical Information Report Number: 161469
  • Archival Resource Key: ark:/67531/metadc622889

Collections

This report is part of the following collection of related materials.

Office of Scientific & Technical Information Technical Reports

Reports, articles and other documents harvested from the Office of Scientific and Technical Information.

Office of Scientific and Technical Information (OSTI) is the Department of Energy (DOE) office that collects, preserves, and disseminates DOE-sponsored research and development (R&D) results that are the outcomes of R&D projects or other funded activities at DOE labs and facilities nationwide and grantees at universities and other institutions.

What responsibilities do I have when using this report?

When

Dates and time periods associated with this report.

Creation Date

  • March 28, 1995

Added to The UNT Digital Library

  • June 16, 2015, 7:43 a.m.

Description Last Updated

  • April 8, 2016, 5:26 p.m.

Usage Statistics

When was this report last used?

Yesterday: 0
Past 30 days: 0
Total Uses: 3

Interact With This Report

Here are some suggestions for what to do next.

Start Reading

PDF Version Also Available for Download.

Citations, Rights, Re-Use

TEAM (Technologies Enabling Agile Manufacturing) macro planner requirements guide: Version 1.0, report, March 28, 1995; Tennessee. (digital.library.unt.edu/ark:/67531/metadc622889/: accessed December 18, 2017), University of North Texas Libraries, Digital Library, digital.library.unt.edu; crediting UNT Libraries Government Documents Department.