FMEF Electrical single line diagram and panel schedule verification process

PDF Version Also Available for Download.

Description

Since the FMEF did not have a mission, a formal drawing verification program was not developed, however, a verification process on essential electrical single line drawings and panel schedules was established to benefit the operations lock and tag program and to enhance the electrical safety culture of the facility. The purpose of this document is to provide a basis by which future landlords and cognizant personnel can understand the degree of verification performed on the electrical single lines and panel schedules. It is the intent that this document be revised or replaced by a more formal requirements document if a ... continued below

Physical Description

13 pages

Creation Information

FONG, S.K. November 11, 1998.

Context

This report is part of the collection entitled: Office of Scientific & Technical Information Technical Reports and was provided by UNT Libraries Government Documents Department to Digital Library, a digital repository hosted by the UNT Libraries. It has been viewed 514 times , with 65 in the last month . More information about this report can be viewed below.

Who

People and organizations associated with either the creation of this report or its content.

Author

Publisher

  • Hanford Site (Wash.)
    Publisher Info: HNF Hanford Site (United States)
    Place of Publication: United States

Provided By

UNT Libraries Government Documents Department

Serving as both a federal and a state depository library, the UNT Libraries Government Documents Department maintains millions of items in a variety of formats. The department is a member of the FDLP Content Partnerships Program and an Affiliated Archive of the National Archives.

Contact Us

What

Descriptive information to help identify this report. Follow the links below to find similar items on the Digital Library.

Description

Since the FMEF did not have a mission, a formal drawing verification program was not developed, however, a verification process on essential electrical single line drawings and panel schedules was established to benefit the operations lock and tag program and to enhance the electrical safety culture of the facility. The purpose of this document is to provide a basis by which future landlords and cognizant personnel can understand the degree of verification performed on the electrical single lines and panel schedules. It is the intent that this document be revised or replaced by a more formal requirements document if a mission is identified for the FMEF.

Physical Description

13 pages

Notes

INIS; OSTI as DE00011264

Source

  • Other Information: PBD: 11 Nov 1998

Language

Item Type

Identifier

Unique identifying numbers for this report in the Digital Library or other systems.

  • Report No.: HNF--3584--REV0
  • Report No.: YN0100000
  • Grant Number: AC06-96RL13200
  • DOI: 10.2172/11264 | External Link
  • Office of Scientific & Technical Information Report Number: 11264
  • Archival Resource Key: ark:/67531/metadc620899

Collections

This report is part of the following collection of related materials.

Office of Scientific & Technical Information Technical Reports

Reports, articles and other documents harvested from the Office of Scientific and Technical Information.

Office of Scientific and Technical Information (OSTI) is the Department of Energy (DOE) office that collects, preserves, and disseminates DOE-sponsored research and development (R&D) results that are the outcomes of R&D projects or other funded activities at DOE labs and facilities nationwide and grantees at universities and other institutions.

What responsibilities do I have when using this report?

When

Dates and time periods associated with this report.

Creation Date

  • November 11, 1998

Added to The UNT Digital Library

  • June 16, 2015, 7:43 a.m.

Description Last Updated

  • April 27, 2016, 4:12 p.m.

Usage Statistics

When was this report last used?

Yesterday: 0
Past 30 days: 65
Total Uses: 514

Interact With This Report

Here are some suggestions for what to do next.

Start Reading

PDF Version Also Available for Download.

Citations, Rights, Re-Use

FONG, S.K. FMEF Electrical single line diagram and panel schedule verification process, report, November 11, 1998; United States. (digital.library.unt.edu/ark:/67531/metadc620899/: accessed December 18, 2017), University of North Texas Libraries, Digital Library, digital.library.unt.edu; crediting UNT Libraries Government Documents Department.