As part of regulatory oversight requirements, the U.S. Nuclear Regulatory Commission (USNRC) staff conducts inspection activities to assess operational safety performance in nuclear power plants. Currently, guidance in these inspections is provided by procedures in the NRC Inspection Manual and issuance of Temporary Instructions defining the objectives and scope of the inspection effort. In several studies sponsored by the USNRC over the last few years, Brookhaven National Laboratory (BNL) has developed and applied methodologies for providing risk-based inspection guidance for the safety assessments of nuclear power plant systems. One recent methodology integrates insights from existing Probabilistic Risk Assessment (PRA) studies ... continued below

Physical Description

4 p.

Creation Information

Wong, S. M.; Higgins, J. C. & Martinez-Guridi, G. July 1995.

Context

This article is part of the collection entitled: Office of Scientific & Technical Information Technical Reports and was provided by UNT Libraries Government Documents Department to Digital Library, a digital repository hosted by the UNT Libraries. More information about this article can be viewed below.

Who

People and organizations associated with either the creation of this article or its content.

Sponsor

Publishers

Provided By

UNT Libraries Government Documents Department

Serving as both a federal and a state depository library, the UNT Libraries Government Documents Department maintains millions of items in a variety of formats. The department is a member of the FDLP Content Partnerships Program and an Affiliated Archive of the National Archives.

Contact Us

What

Descriptive information to help identify this article. Follow the links below to find similar items on the Digital Library.

Description

As part of regulatory oversight requirements, the U.S. Nuclear Regulatory Commission (USNRC) staff conducts inspection activities to assess operational safety performance in nuclear power plants. Currently, guidance in these inspections is provided by procedures in the NRC Inspection Manual and issuance of Temporary Instructions defining the objectives and scope of the inspection effort. In several studies sponsored by the USNRC over the last few years, Brookhaven National Laboratory (BNL) has developed and applied methodologies for providing risk-based inspection guidance for the safety assessments of nuclear power plant systems. One recent methodology integrates insights from existing Probabilistic Risk Assessment (PRA) studies and Individual Plant Evaluations (TPE) with information from operating experience reviews for consideration in inspection planning for either multi-disciplinary team inspections or individual inspections. In recent studies at BNL, a risk-based methodology was developed to optimize inspection planning for regulatory activities at nuclear power plants. This methodology integrates risk-based insights from the plant configuration risk profile and risk information found in existing PRA/IPE studies.

Physical Description

4 p.

Notes

OSTI as DE95014944

Source

  • American Nuclear Society international topical conference on the safety of operating reactors, Seattle, WA (United States), 17-23 Sep 1995

Language

Item Type

Identifier

Unique identifying numbers for this article in the Digital Library or other systems.

  • Other: DE95014944
  • Report No.: BNL-NUREG--61921
  • Report No.: CONF-950914--3
  • Grant Number: AC02-76CH00016
  • Office of Scientific & Technical Information Report Number: 100137
  • Archival Resource Key: ark:/67531/metadc620848

Collections

This article is part of the following collection of related materials.

Office of Scientific & Technical Information Technical Reports

What responsibilities do I have when using this article?

When

Dates and time periods associated with this article.

Creation Date

  • July 1995

Added to The UNT Digital Library

  • June 16, 2015, 7:43 a.m.

Description Last Updated

  • April 7, 2016, 7:35 p.m.

Usage Statistics

When was this article last used?

Yesterday: 1
Past 30 days: 2
Total Uses: 7

Interact With This Article

Here are some suggestions for what to do next.

Start Reading

PDF Version Also Available for Download.

Citations, Rights, Re-Use

Wong, S. M.; Higgins, J. C. & Martinez-Guridi, G. Application of risk-based methods to optimize inspection planning for regulatory activities at nuclear power plants, article, July 1995; United States. (digital.library.unt.edu/ark:/67531/metadc620848/: accessed August 17, 2017), University of North Texas Libraries, Digital Library, digital.library.unt.edu; crediting UNT Libraries Government Documents Department.