National Ignition Facility start-up/operations engineering and special equipment construction health and safety plan

PDF Version Also Available for Download.

Description

This document sets forth the responsibilities, interfaces, guidelines, rules, policy, and regulations for all workers involved in the S/O and SE construction, installation, and acceptance testing. This document is enforced from the first day that S/O and SE workers set foot on the NIF construction site until the end of the Project at Critical Decision 4. This document is applicable only to site activities, which are defined as those that occur within the perimeter of the fenced-off NIF construction zone and the Target Chamber Assembly Area (Helipad). The associated Special Equipment laydown and construction support areas listed in Appendix B ... continued below

Physical Description

5.3 Megabytes pages

Creation Information

Huddleston, P. C. May 8, 1998.

Context

This report is part of the collection entitled: Office of Scientific & Technical Information Technical Reports and was provided by UNT Libraries Government Documents Department to Digital Library, a digital repository hosted by the UNT Libraries. It has been viewed 189 times , with 7 in the last month . More information about this report can be viewed below.

Who

People and organizations associated with either the creation of this report or its content.

Sponsor

Publisher

Provided By

UNT Libraries Government Documents Department

Serving as both a federal and a state depository library, the UNT Libraries Government Documents Department maintains millions of items in a variety of formats. The department is a member of the FDLP Content Partnerships Program and an Affiliated Archive of the National Archives.

Contact Us

What

Descriptive information to help identify this report. Follow the links below to find similar items on the Digital Library.

Description

This document sets forth the responsibilities, interfaces, guidelines, rules, policy, and regulations for all workers involved in the S/O and SE construction, installation, and acceptance testing. This document is enforced from the first day that S/O and SE workers set foot on the NIF construction site until the end of the Project at Critical Decision 4. This document is applicable only to site activities, which are defined as those that occur within the perimeter of the fenced-off NIF construction zone and the Target Chamber Assembly Area (Helipad). The associated Special Equipment laydown and construction support areas listed in Appendix B are not under this plan; their safety provisions are discussed in the Appendix. Prototype and other support activities, such as the Amplifier Laboratory and Frame Assembly Unit assembly area, are not included in this plan. After completion of the Operational Readiness Review, the Facility Safety Procedure, Operational Safety Requirements, and Operational Safety Procedures are the governing safety documents for the operating facility. The S/O and SE project elements are required to implement measures that create a universal awareness of and promote safe job practices at the site. This includes all Lawrence Livermore National Laboratory (LLNL), Los Alamos National Laboratory, Sandia National Laboratories, University of Rochester, supplement labor organization, and subcontractor employees; visitors; and guests serving the S/O and SE effort.

Physical Description

5.3 Megabytes pages

Source

  • Other Information: PBD: 8 May 1998

Language

Item Type

Identifier

Unique identifying numbers for this report in the Digital Library or other systems.

  • Report No.: UCRL-ID-127610--Rev-1
  • Report No.: 39DP02000
  • Grant Number: W-7405-ENG-48
  • DOI: 10.2172/14772 | External Link
  • Office of Scientific & Technical Information Report Number: 14772
  • Archival Resource Key: ark:/67531/metadc619436

Collections

This report is part of the following collection of related materials.

Office of Scientific & Technical Information Technical Reports

Reports, articles and other documents harvested from the Office of Scientific and Technical Information.

Office of Scientific and Technical Information (OSTI) is the Department of Energy (DOE) office that collects, preserves, and disseminates DOE-sponsored research and development (R&D) results that are the outcomes of R&D projects or other funded activities at DOE labs and facilities nationwide and grantees at universities and other institutions.

What responsibilities do I have when using this report?

When

Dates and time periods associated with this report.

Creation Date

  • May 8, 1998

Added to The UNT Digital Library

  • June 16, 2015, 7:43 a.m.

Description Last Updated

  • Feb. 19, 2016, 8:22 p.m.

Usage Statistics

When was this report last used?

Yesterday: 0
Past 30 days: 7
Total Uses: 189

Interact With This Report

Here are some suggestions for what to do next.

Start Reading

PDF Version Also Available for Download.

Citations, Rights, Re-Use

Huddleston, P. C. National Ignition Facility start-up/operations engineering and special equipment construction health and safety plan, report, May 8, 1998; California. (digital.library.unt.edu/ark:/67531/metadc619436/: accessed December 16, 2017), University of North Texas Libraries, Digital Library, digital.library.unt.edu; crediting UNT Libraries Government Documents Department.