HNF-MR-0535, Rev. 0
Table 3. Critical Problem Management List--Hypothetical Example.
970327.1826
. 1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17Identificationnumber Critical Problem Consequence(s) Action(s) Status Responsible Review
and description ? value person date
(yes/no)
EEM-104 NEAR-FIELD MONITORING IS NOT SUPPORTED OR BEING DONE AS REQUIRED BY DIRECTIVES.
On May3l,arapid Yes VH Reduced ability to Evaluate need for See J.J. Jones 6/31/97
increase in air safely manage and termination of facility attached (FDH)
concentrations report radioactive operations. evaluation
alarmed a continuous releases. in letter
air monitor in work report xxx.
area; not monitored
as an effluent. No Evaluate need for D.B. Cooper 6/31/97
ambient air sampler additional (DES)
nearby for monitoring.
contnuation.1-11
Upcoming Pages
Here’s what’s next.
Search Inside
This report can be searched. Note: Results may vary based on the legibility of text within the document.
Tools / Downloads
Get a copy of this page or view the extracted text.
Citing and Sharing
Basic information for referencing this web page. We also provide extended guidance on usage rights, references, copying or embedding.
Reference the current page of this Report.
Diediker, L.P. Integration plan required by performance agreement SM 7.2.1, report, March 28, 1997; (https://digital.library.unt.edu/ark:/67531/metadc619261/m1/30/: accessed March 28, 2024), University of North Texas Libraries, UNT Digital Library, https://digital.library.unt.edu; crediting UNT Libraries Government Documents Department.