Force Structure: Army and Marine Corps Efforts to Review Nonstandard Equipment for Future Usefulness

PDF Version Also Available for Download.

Description

Correspondence issued by the Government Accountability Office with an abstract that begins "In summary, the Army and the Marine Corps have taken steps to determine the future usefulness of nonstandard equipment but have not finalized all of the decisions on whether to add such equipment to unit authorization documents. As of November 2011, the Army had reviewed 409 equipment systems through its Capabilities Development for Rapid Transition process, determining that about 11 percent of that equipment is useful for the future and about 37 percent is not needed and should be terminated. The Army has not made a final decision ... continued below

Creation Information

United States. Government Accountability Office. May 31, 2012.

Context

This text is part of the collection entitled: Government Accountability Office Reports and was provided by UNT Libraries Government Documents Department to Digital Library, a digital repository hosted by the UNT Libraries. It has been viewed 20 times . More information about this text can be viewed below.

Who

People and organizations associated with either the creation of this text or its content.

Provided By

UNT Libraries Government Documents Department

Serving as both a federal and a state depository library, the UNT Libraries Government Documents Department maintains millions of items in a variety of formats. The department is a member of the FDLP Content Partnerships Program and an Affiliated Archive of the National Archives.

Contact Us

What

Descriptive information to help identify this text. Follow the links below to find similar items on the Digital Library.

Description

Correspondence issued by the Government Accountability Office with an abstract that begins "In summary, the Army and the Marine Corps have taken steps to determine the future usefulness of nonstandard equipment but have not finalized all of the decisions on whether to add such equipment to unit authorization documents. As of November 2011, the Army had reviewed 409 equipment systems through its Capabilities Development for Rapid Transition process, determining that about 11 percent of that equipment is useful for the future and about 37 percent is not needed and should be terminated. The Army has not made a final decision on the future need for the remaining 52 percent of the equipment, which it continues to sustain for current operations primarily through the use of overseas contingency operations funds. The Army has also taken some additional actions to review nonstandard equipment through other forums and reviews which have led to recommendations for some items to be retained for the future. Since 2008, the Marine Corps has reviewed 144 different requests for capabilities to fill gaps identified by commanders. Of these, the Marine Corps has determined that about 63 percent will continue to be needed in the future to meet enduring requirements and should be incorporated into the Marine Corps force structure and about 17 percent will not be needed. An additional 21 percent are in initial development or are still being evaluated for future usefulness. In addition to service-provided equipment, some nonstandard equipment, such as Mine Resistant Ambush Protected vehicles (MRAP), was fielded by DOD and managed as a joint program. According to the Army and the Marine Corps, both services are now transitioning the management of MRAPs from a joint office to service offices, and are in the process of determining how many MRAPs they want to retain for the future and add to their respective authorization documents."

Subjects

Language

Item Type

Identifier

Unique identifying numbers for this text in the Digital Library or other systems.

Collections

This text is part of the following collection of related materials.

Government Accountability Office Reports

The U.S. Government Accountability Office (GAO) is an independent, nonpartisan agency that works for the U.S. Congress investigating how the federal government spends taxpayers' money. Its goal is to increase accountability and improve the performance of the federal government. The Government Accountability Office Reports Collection consists of over 13,000 documents on a variety of topics ranging from fiscal issues to international affairs.

What responsibilities do I have when using this text?

When

Dates and time periods associated with this text.

Creation Date

  • May 31, 2012

Added to The UNT Digital Library

  • June 12, 2014, 7:50 p.m.

Usage Statistics

When was this text last used?

Yesterday: 0
Past 30 days: 1
Total Uses: 20

Where

Geographical information about where this text originated or about its content.

Place Name

Publication Place

Map Information

  • map marker Automatically generated Place Name coordinates.
  • map marker Automatically generated Publication Place coordinates.
  • Repositioning map may be required for optimal printing.

Mapped Locations

Interact With This Text

Here are some suggestions for what to do next.

Start Reading

PDF Version Also Available for Download.

Citations, Rights, Re-Use

United States. Government Accountability Office. Force Structure: Army and Marine Corps Efforts to Review Nonstandard Equipment for Future Usefulness, text, May 31, 2012; Washington D.C.. (digital.library.unt.edu/ark:/67531/metadc297825/: accessed September 20, 2017), University of North Texas Libraries, Digital Library, digital.library.unt.edu; crediting UNT Libraries Government Documents Department.