A letter report issued by the Government Accountability Office with an abstract that begins "The Department of Defense's (DOD) C-5 Galaxy and C-17 Globemaster III aircraft play key roles in transporting weapons and other cargo. Since September 2001, these aircraft have delivered over 2.4 million tons of cargo to staging and operating bases in Iraq and Afghanistan. Yet determining the number and mix to meet current and future airlift requirements has become increasingly challenging given distinct differences between the two aircraft. While the C-5 can carry more cargo, the newer C-17 is more flexible since it can deliver to forward-deployed ... continued below

Creation Information

United States. Government Accountability Office. November 21, 2008.

Context

This report is part of the collection entitled: Government Accountability Office Reports and was provided by UNT Libraries Government Documents Department to Digital Library, a digital repository hosted by the UNT Libraries. More information about this report can be viewed below.

Who

People and organizations associated with either the creation of this report or its content.

Provided By

UNT Libraries Government Documents Department

Serving as both a federal and a state depository library, the UNT Libraries Government Documents Department maintains millions of items in a variety of formats. The department is a member of the FDLP Content Partnerships Program and an Affiliated Archive of the National Archives.

Contact Us

What

Descriptive information to help identify this report. Follow the links below to find similar items on the Digital Library.

Description

A letter report issued by the Government Accountability Office with an abstract that begins "The Department of Defense's (DOD) C-5 Galaxy and C-17 Globemaster III aircraft play key roles in transporting weapons and other cargo. Since September 2001, these aircraft have delivered over 2.4 million tons of cargo to staging and operating bases in Iraq and Afghanistan. Yet determining the number and mix to meet current and future airlift requirements has become increasingly challenging given distinct differences between the two aircraft. While the C-5 can carry more cargo, the newer C-17 is more flexible since it can deliver to forward-deployed bases and has a higher mission capable rate. GAO was asked to identify the impact C-5 modernization cost increases have had on the mix of aircraft; assess the current C-5 modernization cost estimate; and identify C-17 production plans and issues related to production line shutdown. To conduct its work, GAO reviewed options DOD considered to meet its current and future strategic airlift requirements, and evaluated C-5 modernization and C-17 production line shut down cost estimates."

Language

Item Type

Identifier

Unique identifying numbers for this report in the Digital Library or other systems.

Collections

This report is part of the following collection of related materials.

Government Accountability Office Reports

The U.S. Government Accountability Office (GAO) is an independent, nonpartisan agency that works for the U.S. Congress investigating how the federal government spends taxpayers' money. Its goal is to increase accountability and improve the performance of the federal government. The Government Accountability Office Reports Collection consists of over 13,000 documents on a variety of topics ranging from fiscal issues to international affairs.

What responsibilities do I have when using this report?

When

Dates and time periods associated with this report.

Creation Date

  • November 21, 2008

Added to The UNT Digital Library

  • June 12, 2014, 7:50 p.m.

Usage Statistics

When was this report last used?

Yesterday: 0
Past 30 days: 0
Total Uses: 4

Where

Geographical information about where this report originated or about its content.

Place Name

Publication Place

Map Information

  • map marker Automatically generated Place Name coordinates.
  • map marker Automatically generated Publication Place coordinates.
  • Repositioning map may be required for optimal printing.

Mapped Locations

Interact With This Report

Here are some suggestions for what to do next.

Start Reading

PDF Version Also Available for Download.

Citations, Rights, Re-Use

United States. Government Accountability Office. Defense Acquisitions: Timely and Accurate Estimates of Costs and Requirements Are Needed to Define Optimal Future Strategic Airlift Mix, report, November 21, 2008; Washington D.C.. (digital.library.unt.edu/ark:/67531/metadc295462/: accessed April 25, 2018), University of North Texas Libraries, Digital Library, digital.library.unt.edu; crediting UNT Libraries Government Documents Department.