A memorandum prepared by the Technical Department discussing the technical considerations involved in raising Pile power above the present level of 280 M.W. was discussed. A meeting attended by W. O. Simon, B. H. Mackey, L. Squires, H. Worthington, C. N. Gross, W. E. Jordan and M. H. Smith. The details of this memorandum were reviewed and the plan proposed for operation of the piles subsequent to August 1, 1945 is discussed in this report.
Serving as both a federal and a state depository library, the UNT Libraries Government Documents Department maintains millions of items in a variety of formats. The department is a member of the FDLP Content Partnerships Program and an Affiliated Archive of the National Archives.
Descriptive information to help identify this report.
Follow the links below to find similar items on the Digital Library.
Description
A memorandum prepared by the Technical Department discussing the technical considerations involved in raising Pile power above the present level of 280 M.W. was discussed. A meeting attended by W. O. Simon, B. H. Mackey, L. Squires, H. Worthington, C. N. Gross, W. E. Jordan and M. H. Smith. The details of this memorandum were reviewed and the plan proposed for operation of the piles subsequent to August 1, 1945 is discussed in this report.
This report is part of the following collection of related materials.
Office of Scientific & Technical Information Technical Reports
Reports, articles and other documents harvested from the Office of Scientific and Technical Information.
Office of Scientific and Technical Information (OSTI) is the Department of Energy (DOE) office that collects, preserves, and disseminates DOE-sponsored research and development (R&D) results that are the outcomes of R&D projects or other funded activities at DOE labs and facilities nationwide and grantees at universities and other institutions.