This report contains a flowsheet which was prepared to serve as a guide for an engineering study to be made to determine the costs and revisions required to increase the capacity of the Purex Plant to a 4.0 capacity factor. The needs for such a study are outlined in documents HW-62952 (Ref. 1) and HW-63927 (Ref. 2), which include increased 100 Area production forecasts and maximizing Palm recovery by continuous recovery equipment as primary factors. The flowsheet, shown graphically on the flowsketch and specifically in tabular form under Table 1, is a ``best estimate`` of process conditions and modifications which …
continued below
Publisher Info:
General Electric Co., Richland, WA (United States). Hanford Atomic Products Operation
Place of Publication:
Richland, Washington
Provided By
UNT Libraries Government Documents Department
Serving as both a federal and a state depository library, the UNT Libraries Government Documents Department maintains millions of items in a variety of formats. The department is a member of the FDLP Content Partnerships Program and an Affiliated Archive of the National Archives.
Descriptive information to help identify this report.
Follow the links below to find similar items on the Digital Library.
Description
This report contains a flowsheet which was prepared to serve as a guide for an engineering study to be made to determine the costs and revisions required to increase the capacity of the Purex Plant to a 4.0 capacity factor. The needs for such a study are outlined in documents HW-62952 (Ref. 1) and HW-63927 (Ref. 2), which include increased 100 Area production forecasts and maximizing Palm recovery by continuous recovery equipment as primary factors. The flowsheet, shown graphically on the flowsketch and specifically in tabular form under Table 1, is a ``best estimate`` of process conditions and modifications which will be in operation by the third quarter of FY 1962. The modifications included are: Formaldehyde Treatment of Concentrated Wastes -- IWW (Ref. 5 and 6); A Continuous Palm Recovery Cycle; A Palm Ion Exchange Purification and Loadout Facility (Ref. 3); Alkaline-Permanganate Washing of the No. 2 Organic System Solvent; and Rough-cut Fission Product Recovery and Shipping (Ref. 4). Since the fission product recovery and shipping operations do not effect the equilibrium conditions of the plant, they are not included in the flowsheet.
Physical Description
14 p.
Notes
OSTI as DE94000423; Paper copy available at OSTI: phone, 865-576-8401, or email, reports@adonis.osti.gov
This report is part of the following collection of related materials.
Office of Scientific & Technical Information Technical Reports
Reports, articles and other documents harvested from the Office of Scientific and Technical Information.
Office of Scientific and Technical Information (OSTI) is the Department of Energy (DOE) office that collects, preserves, and disseminates DOE-sponsored research and development (R&D) results that are the outcomes of R&D projects or other funded activities at DOE labs and facilities nationwide and grantees at universities and other institutions.
Geier, R. G. & Duckworth, J. P.Purex Plant flowsheet for high capacity study,
report,
March 28, 1960;
Richland, Washington.
(https://digital.library.unt.edu/ark:/67531/metadc1395689/:
accessed January 12, 2025),
University of North Texas Libraries, UNT Digital Library, https://digital.library.unt.edu;
crediting UNT Libraries Government Documents Department.