The Criteria for Speed of Control must be met for all cases being considered in the Expansion Studies. These Criteria are dependent upon the ratio Volume of water/volume of uranium in the process channel, the reactor power level, and the rate at which the vertical rods are released and inserted into the reactor. For those cases wherein the graphite channel is overbored by 0.200 inch., the criteria can generally be met for the power levels under consideration since the ratio of Vw/Vu is maintained adequately small by the use of large diameter fuel elements. If the graphite is not overbored, …
continued below
Publisher Info:
General Electric Co., Richland, WA (United States). Hanford Atomic Products Operation
Place of Publication:
Richland, Washington
Provided By
UNT Libraries Government Documents Department
Serving as both a federal and a state depository library, the UNT Libraries Government Documents Department maintains millions of items in a variety of formats. The department is a member of the FDLP Content Partnerships Program and an Affiliated Archive of the National Archives.
Descriptive information to help identify this report.
Follow the links below to find similar items on the Digital Library.
Description
The Criteria for Speed of Control must be met for all cases being considered in the Expansion Studies. These Criteria are dependent upon the ratio Volume of water/volume of uranium in the process channel, the reactor power level, and the rate at which the vertical rods are released and inserted into the reactor. For those cases wherein the graphite channel is overbored by 0.200 inch., the criteria can generally be met for the power levels under consideration since the ratio of Vw/Vu is maintained adequately small by the use of large diameter fuel elements. If the graphite is not overbored, high pressure drop across the fuel element section must be maintained in order to maintain small values of Vw/Vu, which results in a substantial increase in the front header pressure. A method is developed in this document which ties together and defines the hydraulic and physics characteristics of the fuel-process channel geometry necessary to satisfy the Speed of Control Criteria over a range of feasible operating conditions. This study assumes no graphite overboring and employs throughout a smooth bore zircaloy process tube having an inside diameter of 1.650 inches. The fuel elements are self-supported., and the inner hole size was selected to provide an optimum flow split for corrosion considerations.
Physical Description
9 p.
Notes
OSTI as DE94017220; Paper copy available at OSTI: phone, 865-576-8401, or email, reports@adonis.osti.gov
This report is part of the following collection of related materials.
Office of Scientific & Technical Information Technical Reports
Reports, articles and other documents harvested from the Office of Scientific and Technical Information.
Office of Scientific and Technical Information (OSTI) is the Department of Energy (DOE) office that collects, preserves, and disseminates DOE-sponsored research and development (R&D) results that are the outcomes of R&D projects or other funded activities at DOE labs and facilities nationwide and grantees at universities and other institutions.
Gilbert, W. D.; Carlson, P. A. & Nechodom, W. S.Expansion task force: Old reactors speed of control for no overbore cases,
report,
February 22, 1960;
Richland, Washington.
(https://digital.library.unt.edu/ark:/67531/metadc1390355/:
accessed July 9, 2025),
University of North Texas Libraries, UNT Digital Library, https://digital.library.unt.edu;
crediting UNT Libraries Government Documents Department.