Gas-pressure bonding and evaluation of aluminum-clad nickel-plated uranium fuel assemblies

PDF Version Also Available for Download.

Description

We are enclosing three copies of a proposal concerned with the preparation for preliminary evaluation of up to 128 Hanford CV size I and II fuel elements to determine an optimum gas-pressure-bonding cycle for the fabrication of this type of fuel element. This proposal is based on your request as outlined in your letter dated May 7, 1962, and document No. HW-72417. Included is a cost estimate of the funding required to conduct this experimental study. All of the aluminum-clad uranium fuel assemblies are to be prepared and furnished by HAPO for gas-pressure bonding at Battelle in existing equipment. To ... continued below

Physical Description

4 p.

Creation Information

Davis, J. E. May 18, 1962.

Context

This report is part of the collection entitled: Office of Scientific & Technical Information Technical Reports and was provided by UNT Libraries Government Documents Department to Digital Library, a digital repository hosted by the UNT Libraries. More information about this report can be viewed below.

Who

People and organizations associated with either the creation of this report or its content.

Author

Sponsor

Publisher

  • Hanford Atomic Products Operation
    Publisher Info: General Electric Co., Richland, WA (United States). Hanford Atomic Products Operation
    Place of Publication: Richland, Washington

Provided By

UNT Libraries Government Documents Department

Serving as both a federal and a state depository library, the UNT Libraries Government Documents Department maintains millions of items in a variety of formats. The department is a member of the FDLP Content Partnerships Program and an Affiliated Archive of the National Archives.

Contact Us

What

Descriptive information to help identify this report. Follow the links below to find similar items on the Digital Library.

Description

We are enclosing three copies of a proposal concerned with the preparation for preliminary evaluation of up to 128 Hanford CV size I and II fuel elements to determine an optimum gas-pressure-bonding cycle for the fabrication of this type of fuel element. This proposal is based on your request as outlined in your letter dated May 7, 1962, and document No. HW-72417. Included is a cost estimate of the funding required to conduct this experimental study. All of the aluminum-clad uranium fuel assemblies are to be prepared and furnished by HAPO for gas-pressure bonding at Battelle in existing equipment. To implement the proposed program we have also enclosed six copies of the BMI-AEC research agreement (Serial No. 88). The agreement provides for a six-month research period with an estimated total cost of $24,780. This sum includes $1,180 find fee as established in Contract No. W-7405-ENG-92. Receipt of two fully amounted copies of the agreement, classification guidance, and the specimens will allow us to proceed.

Physical Description

4 p.

Notes

OSTI as DE94017621; Paper copy available at OSTI: phone, 865-576-8401, or email, reports@adonis.osti.gov

Source

  • Other Information: DN: Declassified

Language

Item Type

Identifier

Unique identifying numbers for this report in the Digital Library or other systems.

  • Other: DE94017621
  • Report No.: HW-BMI--10
  • Grant Number: AC06-76RL01830
  • DOI: 10.2172/10178156 | External Link
  • Office of Scientific & Technical Information Report Number: 10178156
  • Archival Resource Key: ark:/67531/metadc1388697

Collections

This report is part of the following collection of related materials.

Office of Scientific & Technical Information Technical Reports

Reports, articles and other documents harvested from the Office of Scientific and Technical Information.

Office of Scientific and Technical Information (OSTI) is the Department of Energy (DOE) office that collects, preserves, and disseminates DOE-sponsored research and development (R&D) results that are the outcomes of R&D projects or other funded activities at DOE labs and facilities nationwide and grantees at universities and other institutions.

What responsibilities do I have when using this report?

When

Dates and time periods associated with this report.

Creation Date

  • May 18, 1962

Added to The UNT Digital Library

  • Nov. 28, 2018, 2:33 p.m.

Description Last Updated

  • Dec. 13, 2018, 6:44 p.m.

Usage Statistics

When was this report last used?

Congratulations! It looks like you are the first person to view this item online.

Interact With This Report

Here are some suggestions for what to do next.

Start Reading

PDF Version Also Available for Download.

International Image Interoperability Framework

IIF Logo

We support the IIIF Presentation API

Davis, J. E. Gas-pressure bonding and evaluation of aluminum-clad nickel-plated uranium fuel assemblies, report, May 18, 1962; Richland, Washington. (digital.library.unt.edu/ark:/67531/metadc1388697/: accessed January 22, 2019), University of North Texas Libraries, Digital Library, digital.library.unt.edu; crediting UNT Libraries Government Documents Department.