Irradiation of the initial test in this program involving ten tubes of alternately charged nickel-plated C-64 alloy clad test elements and X-8001 alloy control elements has been successfully completed. The test indicated that the nickel-plate spalling problem has been resolved as no significant spalling or flaking was observed during the post-irradiation examination. The second test in this program will be to verify the performance of nickel-plate with a pilot loading (up to 100 charges) of fuel elements which have been nickel-plated on a production basis. The objectives of this test are to demonstrate with a larger scale test that nickel-plate …
continued below
Publisher Info:
General Electric Co., Richland, WA (United States). Hanford Atomic Products Operation
Place of Publication:
Richland, Washington
Provided By
UNT Libraries Government Documents Department
Serving as both a federal and a state depository library, the UNT Libraries Government Documents Department maintains millions of items in a variety of formats. The department is a member of the FDLP Content Partnerships Program and an Affiliated Archive of the National Archives.
Descriptive information to help identify this report.
Follow the links below to find similar items on the Digital Library.
Description
Irradiation of the initial test in this program involving ten tubes of alternately charged nickel-plated C-64 alloy clad test elements and X-8001 alloy control elements has been successfully completed. The test indicated that the nickel-plate spalling problem has been resolved as no significant spalling or flaking was observed during the post-irradiation examination. The second test in this program will be to verify the performance of nickel-plate with a pilot loading (up to 100 charges) of fuel elements which have been nickel-plated on a production basis. The objectives of this test are to demonstrate with a larger scale test that nickel-plate performs satisfactorily and that reducing the nominal plate thickness from .6 mil to .2 mil will not affect the performance of the nickel-plate fuel element. This test authorizes the irradiation of up to 100 columns of OIIN, chemically nickel-plated, C-64 alloy jacketed fuel elements to 200% of normal goal exposure to extend the evaluation of nickel-plated fuel elements on a pilot scale at DR Reactor. Seventy columns will be plated to a nominal thickness of .6 mil and thirty columns to a nominal .2 mil thickness. Twenty measured columns, ten representing each plate thickness, will be charged to monitor the irradiation performance. Effluent samples will be obtained during the course of the test from a pair of tubes, each tube containing a measured monitor charge representing each plate thickness.
This report is part of the following collection of related materials.
Office of Scientific & Technical Information Technical Reports
Reports, articles and other documents harvested from the Office of Scientific and Technical Information.
Office of Scientific and Technical Information (OSTI) is the Department of Energy (DOE) office that collects, preserves, and disseminates DOE-sponsored research and development (R&D) results that are the outcomes of R&D projects or other funded activities at DOE labs and facilities nationwide and grantees at universities and other institutions.
Clinton, M. A.Supplement A to PT-IP-263-A-FP evaluation of chemically nickel plated fuel elements,
report,
July 10, 1961;
Richland, Washington.
(https://digital.library.unt.edu/ark:/67531/metadc1388346/:
accessed September 21, 2023),
University of North Texas Libraries, UNT Digital Library, https://digital.library.unt.edu;
crediting UNT Libraries Government Documents Department.