Several decisions regarding basic project philosophy must be made in order to proceed with scope design and the preparation of equipment procurement specifcations. The purpose of this document is to present as much pertinent data as possible to allow the project representatives to become familiar with the problems involved. A meeting of Representatives is planned for the near future after receipt of project authorization to discuss the scope of this project and its relationship to CG-775. Emergency flow requirements of the K reactors for planned future power levels is approximately 32,000 gpm within 68 sec. A detailed study of the …
continued below
Publisher Info:
General Electric Co., Richland, WA (United States). Hanford Atomic Products Operation
Place of Publication:
Richland, Washington
Provided By
UNT Libraries Government Documents Department
Serving as both a federal and a state depository library, the UNT Libraries Government Documents Department maintains millions of items in a variety of formats. The department is a member of the FDLP Content Partnerships Program and an Affiliated Archive of the National Archives.
Descriptive information to help identify this report.
Follow the links below to find similar items on the Digital Library.
Description
Several decisions regarding basic project philosophy must be made in order to proceed with scope design and the preparation of equipment procurement specifcations. The purpose of this document is to present as much pertinent data as possible to allow the project representatives to become familiar with the problems involved. A meeting of Representatives is planned for the near future after receipt of project authorization to discuss the scope of this project and its relationship to CG-775. Emergency flow requirements of the K reactors for planned future power levels is approximately 32,000 gpm within 68 sec. A detailed study of the existing high-pressure cross-tie line reveals that a duplicate cross-tie line and five low lift pump operation would be required to provide this flow. The existing emergency generation capacity is not adequate to supply five low lift pumps and all other necessary emergency electrical loads. A possible solution to adequate emergency flows is to connect the proposed steam turbine pump directly to the risers and to consider the turbine pump as the last ditch system. If it is determined that this does not meet the criteria of separate systems, then an alternate solution must be found.
Physical Description
16 p.
Notes
OSTI as DE94016410; Paper copy available at OSTI: phone, 865-576-8401, or email, reports@adonis.osti.gov
This report is part of the following collection of related materials.
Office of Scientific & Technical Information Technical Reports
Reports, articles and other documents harvested from the Office of Scientific and Technical Information.
Office of Scientific and Technical Information (OSTI) is the Department of Energy (DOE) office that collects, preserves, and disseminates DOE-sponsored research and development (R&D) results that are the outcomes of R&D projects or other funded activities at DOE labs and facilities nationwide and grantees at universities and other institutions.