Ship Overhaul and Repair evaluated workload data based on the 2025 force structure and
associated workload requirements.
e. Surge
Maintenance
The JCS scenarios for wartime/contingency are the basis for the wartime
requirement. The surge requirement is based on the ability to go from peacetime to
wartime operations. The peacetime operations are based on a 40-hour workweek, while
the wartime operations are based on a 60-hour workweek (no additional augmentation:
facilities, equipment, and personnel). The surge requirement is the delta between
peacetime and wartime capability requirements.
Munitions and Armaments
There are no over-arching DoD-wide surge requirements for munitions and
armaments. Surge is a function of the individual Services and when there is a
contingency, scenarios are run to determine variance from peacetime production to meet
war-fighter requirements, subsequently OPLANs are augmented or updated. Using
current capacity as the baseline and maximum capacity as the most that a facility can
produce, surge becomes a factor of the two and is driven by requirements generated by
each of the Military Departments. The Industrial JCSG eliminated excess capacity and
redundancy through closures and realignments, created multi-functional installations, and
avoided the creation of single points of failure. These actions result in an industrial base
that is efficient, effective, flexible and multi-functional and capable of responding to
surge requirements through additional shifts. Known surge requirements are as follows:
* Marine Corps: Ammunitions requirements are based on a Total Munitions
Requirements (TMR). When there is a contingency, an OPLAN from the war
fighters augment or update the plan to what is needed to support a war.
* Navy: Does not have written, doctrinal guidance on which to base surge
requirement.
* Air Force: Does not have a source for surge requirements.26
Upcoming Pages
Here’s what’s next.
Search Inside
This book can be searched. Note: Results may vary based on the legibility of text within the document.
Tools / Downloads
Get a copy of this page or view the extracted text.
Citing and Sharing
Basic information for referencing this web page. We also provide extended guidance on usage rights, references, copying or embedding.
Reference the current page of this Book.
United States. Department of Defense. BRAC 2005 DoD Report Volume VIII (Industrial JCSG Report), book, May 25, 2005; (https://digital.library.unt.edu/ark:/67531/metadc13742/m1/29/: accessed April 18, 2024), University of North Texas Libraries, UNT Digital Library, https://digital.library.unt.edu; crediting UNT Libraries Government Documents Department.