This document has been written in part to answer questions concerning the feasibility and advisability of ``quickie`` discharge of ruptures at C Reactor. Justification of full pile operational charge-discharge (OC-D) is based in part on outage savings resulting from improved, rupture removal. Since a portion of the rupture removals might be accomplished within the scram recovery time (quickie) it is necessary to consider recovery time as a function of anticipated future power levels. In addition to answering the questions mentioned above, it was felt worthwhile at this time to discuss equilibrium control problems associated with OC-D which have been apparent …
continued below
Publisher Info:
General Electric Co., Richland, WA (United States). Hanford Atomic Products Operation
Place of Publication:
Richland, Washington
Provided By
UNT Libraries Government Documents Department
Serving as both a federal and a state depository library, the UNT Libraries Government Documents Department maintains millions of items in a variety of formats. The department is a member of the FDLP Content Partnerships Program and an Affiliated Archive of the National Archives.
Descriptive information to help identify this report.
Follow the links below to find similar items on the Digital Library.
Description
This document has been written in part to answer questions concerning the feasibility and advisability of ``quickie`` discharge of ruptures at C Reactor. Justification of full pile operational charge-discharge (OC-D) is based in part on outage savings resulting from improved, rupture removal. Since a portion of the rupture removals might be accomplished within the scram recovery time (quickie) it is necessary to consider recovery time as a function of anticipated future power levels. In addition to answering the questions mentioned above, it was felt worthwhile at this time to discuss equilibrium control problems associated with OC-D which have been apparent during operation of prototype equipment, and on the basis of this information to consider reactor control with full pile OC-D.
Physical Description
4 p.
Notes
OSTI as DE94017089; Paper copy available at OSTI: phone, 865-576-8401, or email, reports@adonis.osti.gov
This report is part of the following collection of related materials.
Office of Scientific & Technical Information Technical Reports
Reports, articles and other documents harvested from the Office of Scientific and Technical Information.
Office of Scientific and Technical Information (OSTI) is the Department of Energy (DOE) office that collects, preserves, and disseminates DOE-sponsored research and development (R&D) results that are the outcomes of R&D projects or other funded activities at DOE labs and facilities nationwide and grantees at universities and other institutions.
Carter, R. D. & Ferguson, R. L.Operational physics comments on fuel pile operational charge-discharge,
report,
July 15, 1959;
Richland, Washington.
(https://digital.library.unt.edu/ark:/67531/metadc1341504/:
accessed June 15, 2025),
University of North Texas Libraries, UNT Digital Library, https://digital.library.unt.edu;
crediting UNT Libraries Government Documents Department.