Preliminary hazards review overboring Hanford reactors

PDF Version Also Available for Download.

Description

The General Electric Company, as prime contractor to the AEC at Hanford, is proposing to modify the lattice characteristics of the 8 3/8-inch lattice reactors for the purposes of improving the conversion ratio of these reactors. The proposed overbore modification of the reactors would remove the existing aluminum process tubes, enlarge the diameters of the graphite channels by about one-half inch, insert smooth-bore Zircaloy-2 process tubes and refuel the reactor with larger size, self-supported fuel elements. The overbore fuel will remain the internally-and-externally-cooled cylindrical type, but the weight per foot will be about twice that of the present fuel element. … continued below

Physical Description

47 p.

Creation Information

Nilson, R. & Carlson, P. A. July 25, 1962.

Context

This report is part of the collection entitled: Office of Scientific & Technical Information Technical Reports and was provided by the UNT Libraries Government Documents Department to the UNT Digital Library, a digital repository hosted by the UNT Libraries. It has been viewed 12 times. More information about this report can be viewed below.

Who

People and organizations associated with either the creation of this report or its content.

Sponsor

Publisher

  • Hanford Atomic Products Operation
    Publisher Info: General Electric Co., Richland, WA (United States). Hanford Atomic Products Operation
    Place of Publication: Richland, Washington

Provided By

UNT Libraries Government Documents Department

Serving as both a federal and a state depository library, the UNT Libraries Government Documents Department maintains millions of items in a variety of formats. The department is a member of the FDLP Content Partnerships Program and an Affiliated Archive of the National Archives.

Contact Us

What

Descriptive information to help identify this report. Follow the links below to find similar items on the Digital Library.

Description

The General Electric Company, as prime contractor to the AEC at Hanford, is proposing to modify the lattice characteristics of the 8 3/8-inch lattice reactors for the purposes of improving the conversion ratio of these reactors. The proposed overbore modification of the reactors would remove the existing aluminum process tubes, enlarge the diameters of the graphite channels by about one-half inch, insert smooth-bore Zircaloy-2 process tubes and refuel the reactor with larger size, self-supported fuel elements. The overbore fuel will remain the internally-and-externally-cooled cylindrical type, but the weight per foot will be about twice that of the present fuel element. The removal of the inlet and outlet piping connections which would be required in the overboring process will permit the replacement of the existing fittings with ones of improved design. Furthermore, new orifices and venturis which are compatible with the hydraulic characteristics of the overbore tube and fuel geometry and the pumping system will be installed. No basic changes are proposed in the pumping system though the reactor flaw rate may be increased 5--10 percent by changes in hydraulic characteristics depending on the water plant flow capacity.

Physical Description

47 p.

Notes

OSTI as DE94017444; Paper copy available at OSTI: phone, 865-576-8401, or email, reports@adonis.osti.gov

Other Information: DN: Declassified

Language

Item Type

Identifier

Unique identifying numbers for this report in the Digital Library or other systems.

Collections

This report is part of the following collection of related materials.

Office of Scientific & Technical Information Technical Reports

Reports, articles and other documents harvested from the Office of Scientific and Technical Information.

Office of Scientific and Technical Information (OSTI) is the Department of Energy (DOE) office that collects, preserves, and disseminates DOE-sponsored research and development (R&D) results that are the outcomes of R&D projects or other funded activities at DOE labs and facilities nationwide and grantees at universities and other institutions.

What responsibilities do I have when using this report?

When

Dates and time periods associated with this report.

Creation Date

  • July 25, 1962

Added to The UNT Digital Library

  • Nov. 28, 2018, 2:33 p.m.

Description Last Updated

  • Nov. 12, 2024, 9:15 p.m.

Usage Statistics

When was this report last used?

Yesterday: 0
Past 30 days: 0
Total Uses: 12

Interact With This Report

Here are some suggestions for what to do next.

Start Reading

PDF Version Also Available for Download.

International Image Interoperability Framework

IIF Logo

We support the IIIF Presentation API

Nilson, R. & Carlson, P. A. Preliminary hazards review overboring Hanford reactors, report, July 25, 1962; Richland, Washington. (https://digital.library.unt.edu/ark:/67531/metadc1339020/: accessed May 17, 2026), University of North Texas Libraries, UNT Digital Library, https://digital.library.unt.edu; crediting UNT Libraries Government Documents Department.

Back to Top of Screen