The loop was charged October 30, 1959 with seven 12-inch Natural Uranium Zircaloy-2 clad 7-rod clusters. The test was primarily for the new hot-headed method of end closure used on these elements. The loop was pressure tested at 4000 psi after it was charged. Initially the loop was held at low-temperature to study the buildup of oxygen (presumably from radiolytic decomposition of water). After startup the neutron activity held at slightly above normal but the strainer gamma activity was exceptionally low. Frequent additions of LiOH bombs were necessary to maintain the pH at 10.0 (previously it was 4--5 pH but …
continued below
Publisher Info:
General Electric Co., Richland, WA (United States). Hanford Atomic Products Operation
Place of Publication:
Richland, Washington
Provided By
UNT Libraries Government Documents Department
Serving as both a federal and a state depository library, the UNT Libraries Government Documents Department maintains millions of items in a variety of formats. The department is a member of the FDLP Content Partnerships Program and an Affiliated Archive of the National Archives.
Descriptive information to help identify this report.
Follow the links below to find similar items on the Digital Library.
Description
The loop was charged October 30, 1959 with seven 12-inch Natural Uranium Zircaloy-2 clad 7-rod clusters. The test was primarily for the new hot-headed method of end closure used on these elements. The loop was pressure tested at 4000 psi after it was charged. Initially the loop was held at low-temperature to study the buildup of oxygen (presumably from radiolytic decomposition of water). After startup the neutron activity held at slightly above normal but the strainer gamma activity was exceptionally low. Frequent additions of LiOH bombs were necessary to maintain the pH at 10.0 (previously it was 4--5 pH but was raised to pH 10 for this test.) After the temperature was raised to operating conditions the pH held nicely at 10. On November 16, 1959, the heat exchanger exit temperature thermocouple blew out resulting in depressurization of the loop and a reactor scram. Repairs were made during the outage and the loop was returned to normal operation. Eleven scrams occurred during the test period caused by 105-KE or 1706-KER.
Physical Description
4 p.
Notes
OSTI as DE94012830; Paper copy available at OSTI: phone, 865-576-8401, or email, reports@adonis.osti.gov
This report is part of the following collection of related materials.
Office of Scientific & Technical Information Technical Reports
Reports, articles and other documents harvested from the Office of Scientific and Technical Information.
Office of Scientific and Technical Information (OSTI) is the Department of Energy (DOE) office that collects, preserves, and disseminates DOE-sponsored research and development (R&D) results that are the outcomes of R&D projects or other funded activities at DOE labs and facilities nationwide and grantees at universities and other institutions.
Sharp, F. E.KER-3 Operating Report: Test No. K-3-10 -PT-IP 288-A, Test No. K-3-11 -PT-IP-317-A -PT-IP-315-A,
report,
July 13, 1960;
Richland, Washington.
(https://digital.library.unt.edu/ark:/67531/metadc1318818/:
accessed July 14, 2026),
University of North Texas Libraries, UNT Digital Library, https://digital.library.unt.edu;
crediting UNT Libraries Government Documents Department.