Interim goal exposure plans for O-III-NB and O-III-EB material for B, D, DR and F reactors

PDF Version Also Available for Download.

Description

The purpose of this report is to recommend variable goal plans for natural and enriched bumper fuel elements, specifically for 0-III-NB and 0-III-EB materials, to be irradiated at the B, D, DR, and F Reactors. The average goal exposure for all bumper fuel elements at D Reactor was specified to be 900 MWD/T, with provisions being made for revision by normal procedures. Exposures for enriched bumper material at the B, M. and F Reactors were not specified in the PITA supplement authorizing charging of this material.

Physical Description

4 p.

Creation Information

Bloomstrand, R. R. February 13, 1961.

Context

This report is part of the collection entitled: Office of Scientific & Technical Information Technical Reports and was provided by UNT Libraries Government Documents Department to Digital Library, a digital repository hosted by the UNT Libraries. More information about this report can be viewed below.

Who

People and organizations associated with either the creation of this report or its content.

Sponsor

Publisher

  • Hanford Atomic Products Operation
    Publisher Info: General Electric Co., Richland, WA (United States). Hanford Atomic Products Operation
    Place of Publication: Richland, Washington

Provided By

UNT Libraries Government Documents Department

Serving as both a federal and a state depository library, the UNT Libraries Government Documents Department maintains millions of items in a variety of formats. The department is a member of the FDLP Content Partnerships Program and an Affiliated Archive of the National Archives.

Contact Us

What

Descriptive information to help identify this report. Follow the links below to find similar items on the Digital Library.

Description

The purpose of this report is to recommend variable goal plans for natural and enriched bumper fuel elements, specifically for 0-III-NB and 0-III-EB materials, to be irradiated at the B, D, DR, and F Reactors. The average goal exposure for all bumper fuel elements at D Reactor was specified to be 900 MWD/T, with provisions being made for revision by normal procedures. Exposures for enriched bumper material at the B, M. and F Reactors were not specified in the PITA supplement authorizing charging of this material.

Physical Description

4 p.

Notes

OSTI as DE94010503; Paper copy available at OSTI: phone, 865-576-8401, or email, reports@adonis.osti.gov

Source

  • Other Information: DN: Declassified

Language

Item Type

Identifier

Unique identifying numbers for this report in the Digital Library or other systems.

  • Other: DE94010503
  • Report No.: HW--68476
  • Grant Number: AC06-76RL01830
  • DOI: 10.2172/10145366 | External Link
  • Office of Scientific & Technical Information Report Number: 10145366
  • Archival Resource Key: ark:/67531/metadc1315142

Collections

This report is part of the following collection of related materials.

Office of Scientific & Technical Information Technical Reports

Reports, articles and other documents harvested from the Office of Scientific and Technical Information.

Office of Scientific and Technical Information (OSTI) is the Department of Energy (DOE) office that collects, preserves, and disseminates DOE-sponsored research and development (R&D) results that are the outcomes of R&D projects or other funded activities at DOE labs and facilities nationwide and grantees at universities and other institutions.

What responsibilities do I have when using this report?

When

Dates and time periods associated with this report.

Creation Date

  • February 13, 1961

Added to The UNT Digital Library

  • Nov. 3, 2018, 11:47 a.m.

Description Last Updated

  • Nov. 20, 2018, 4:49 p.m.

Usage Statistics

When was this report last used?

Yesterday: 0
Past 30 days: 1
Total Uses: 2

Interact With This Report

Here are some suggestions for what to do next.

Start Reading

PDF Version Also Available for Download.

International Image Interoperability Framework

IIF Logo

We support the IIIF Presentation API

Bloomstrand, R. R. Interim goal exposure plans for O-III-NB and O-III-EB material for B, D, DR and F reactors, report, February 13, 1961; Richland, Washington. (https://digital.library.unt.edu/ark:/67531/metadc1315142/: accessed March 25, 2019), University of North Texas Libraries, Digital Library, https://digital.library.unt.edu; crediting UNT Libraries Government Documents Department.