The Purex Plant was originally designed to operate at a instantaneous rate of 8-1/3 tons of uranium per 24-hour day on a three-cycle flowsheet. Subsequently, the rate was increased to 26-2/3 T/day and the process changed to a two-cycle flowsheet. Recently, flowsheet changes made for neptunium recovery and replacements of certain critical equipment items have altered the plant`s capacity. The status of the plant is discussed in the Continuity of Operations, Plant Improvement Program, Reference 1; wherein, the need for expansion to a capacity factor of 4.0 by January 1, 1962, was envisioned. Reference 2 was prepared to implement that …
continued below
Publisher Info:
General Electric Co., Richland, WA (United States). Hanford Atomic Products Operation
Place of Publication:
Richland, Washington
Provided By
UNT Libraries Government Documents Department
Serving as both a federal and a state depository library, the UNT Libraries Government Documents Department maintains millions of items in a variety of formats. The department is a member of the FDLP Content Partnerships Program and an Affiliated Archive of the National Archives.
Descriptive information to help identify this report.
Follow the links below to find similar items on the Digital Library.
Description
The Purex Plant was originally designed to operate at a instantaneous rate of 8-1/3 tons of uranium per 24-hour day on a three-cycle flowsheet. Subsequently, the rate was increased to 26-2/3 T/day and the process changed to a two-cycle flowsheet. Recently, flowsheet changes made for neptunium recovery and replacements of certain critical equipment items have altered the plant`s capacity. The status of the plant is discussed in the Continuity of Operations, Plant Improvement Program, Reference 1; wherein, the need for expansion to a capacity factor of 4.0 by January 1, 1962, was envisioned. Reference 2 was prepared to implement that program. A new chemical flowsheet, Reference 3, was prepared to serve as a basis for the Purex Expansion Program. The purpose of this engineering study was to determine the changes and capital expenditure needed to obtain a 33-1/3 T/day instantaneous production rate through the Purex Plant. This report discusses equipment additions and modifications that are required for the Purex Plant to operate at an instantaneous rate of 33-1/3 tons of uranium per day on the flowsheet, as described in Reference 3.
Physical Description
59 p.
Notes
OSTI as DE94011320; Paper copy available at OSTI: phone, 865-576-8401, or email, reports@adonis.osti.gov
This report is part of the following collection of related materials.
Office of Scientific & Technical Information Technical Reports
Reports, articles and other documents harvested from the Office of Scientific and Technical Information.
Office of Scientific and Technical Information (OSTI) is the Department of Energy (DOE) office that collects, preserves, and disseminates DOE-sponsored research and development (R&D) results that are the outcomes of R&D projects or other funded activities at DOE labs and facilities nationwide and grantees at universities and other institutions.