Summary of the Operational Status of Reactor Control Instrumentation, Report No. 2

PDF Version Also Available for Download.

Description

The purpose of this review is to report the operability status of the reactor control instrumentation. The status of the instruments was determined twice during the first six months of this year, April 1 and June 1. The information contained in this report is not intended to be a complete description of the control instruments, but only as they apply to reactor control. The assigned Pile Physicist at each reactor reported the status of instrumentation at his reactor. Chart I summarizes the operability status of the various instruments. Chart II shows the relative range of reactor power over which these … continued below

Physical Description

11 p.

Creation Information

Stewart, S. L. July 10, 1961.

Context

This report is part of the collection entitled: Office of Scientific & Technical Information Technical Reports and was provided by the UNT Libraries Government Documents Department to the UNT Digital Library, a digital repository hosted by the UNT Libraries. It has been viewed 20 times. More information about this report can be viewed below.

Who

People and organizations associated with either the creation of this report or its content.

Sponsor

Publisher

  • Hanford Atomic Products Operation
    Publisher Info: General Electric Co., Richland, WA (United States). Hanford Atomic Products Operation
    Place of Publication: Richland, Washington

Provided By

UNT Libraries Government Documents Department

Serving as both a federal and a state depository library, the UNT Libraries Government Documents Department maintains millions of items in a variety of formats. The department is a member of the FDLP Content Partnerships Program and an Affiliated Archive of the National Archives.

Contact Us

What

Descriptive information to help identify this report. Follow the links below to find similar items on the Digital Library.

Description

The purpose of this review is to report the operability status of the reactor control instrumentation. The status of the instruments was determined twice during the first six months of this year, April 1 and June 1. The information contained in this report is not intended to be a complete description of the control instruments, but only as they apply to reactor control. The assigned Pile Physicist at each reactor reported the status of instrumentation at his reactor. Chart I summarizes the operability status of the various instruments. Chart II shows the relative range of reactor power over which these control instruments apply. Appendix II contains a functional description of the instruments and Appendix III lists how each instrument is used during reactor operation.

Physical Description

11 p.

Notes

OSTI as DE94010871; Paper copy available at OSTI: phone, 865-576-8401, or email, reports@adonis.osti.gov

Other Information: DN: Declassified

Language

Item Type

Identifier

Unique identifying numbers for this report in the Digital Library or other systems.

Collections

This report is part of the following collection of related materials.

Office of Scientific & Technical Information Technical Reports

Reports, articles and other documents harvested from the Office of Scientific and Technical Information.

Office of Scientific and Technical Information (OSTI) is the Department of Energy (DOE) office that collects, preserves, and disseminates DOE-sponsored research and development (R&D) results that are the outcomes of R&D projects or other funded activities at DOE labs and facilities nationwide and grantees at universities and other institutions.

What responsibilities do I have when using this report?

When

Dates and time periods associated with this report.

Creation Date

  • July 10, 1961

Added to The UNT Digital Library

  • Nov. 3, 2018, 11:47 a.m.

Description Last Updated

  • Nov. 12, 2024, 12:30 a.m.

Usage Statistics

When was this report last used?

Yesterday: 0
Past 30 days: 0
Total Uses: 20

Interact With This Report

Here are some suggestions for what to do next.

Start Reading

PDF Version Also Available for Download.

International Image Interoperability Framework

IIF Logo

We support the IIIF Presentation API

Stewart, S. L. Summary of the Operational Status of Reactor Control Instrumentation, Report No. 2, report, July 10, 1961; Richland, Washington. (https://digital.library.unt.edu/ark:/67531/metadc1312490/: accessed February 6, 2025), University of North Texas Libraries, UNT Digital Library, https://digital.library.unt.edu; crediting UNT Libraries Government Documents Department.

Back to Top of Screen