Recent studies have confirmed that large incentives exist for overboring the reactor process channels approximately 500 mils in the C and five old reactors under the proposed Plant Improvement Program. Conservative estimates of the incentives for overboring indicate a payout period of about two years for the proposed work, an increase in plutonium production of 15--18%, derived from increased conversion ratio and a reduction in plant unit cost. Since sufficient progress has been made in the areas of reactor development to warrant the necessary planning and budgetary action to accomplish the proposed work, a preliminary study has been conducted to …
continued below
Publisher Info:
General Electric Co., Richland, WA (United States). Hanford Atomic Products Operation
Place of Publication:
Richland, Washington
Provided By
UNT Libraries Government Documents Department
Serving as both a federal and a state depository library, the UNT Libraries Government Documents Department maintains millions of items in a variety of formats. The department is a member of the FDLP Content Partnerships Program and an Affiliated Archive of the National Archives.
Descriptive information to help identify this report.
Follow the links below to find similar items on the Digital Library.
Description
Recent studies have confirmed that large incentives exist for overboring the reactor process channels approximately 500 mils in the C and five old reactors under the proposed Plant Improvement Program. Conservative estimates of the incentives for overboring indicate a payout period of about two years for the proposed work, an increase in plutonium production of 15--18%, derived from increased conversion ratio and a reduction in plant unit cost. Since sufficient progress has been made in the areas of reactor development to warrant the necessary planning and budgetary action to accomplish the proposed work, a preliminary study has been conducted to determine and assess the technical problems associated with the processing and performance of oversize fuels, to define those areas requiring further development, and to provide cost estimates for the conversion and operation of both offsite uranium fabrication facilities and HAPO fuel manufacturing facilities as required to produce oversize fuel elements. Details of this study are contained in this report.
Physical Description
30 p.
Notes
OSTI as DE94012436; Paper copy available at OSTI: phone, 865-576-8401, or email, reports@adonis.osti.gov
This report is part of the following collection of related materials.
Office of Scientific & Technical Information Technical Reports
Reports, articles and other documents harvested from the Office of Scientific and Technical Information.
Office of Scientific and Technical Information (OSTI) is the Department of Energy (DOE) office that collects, preserves, and disseminates DOE-sponsored research and development (R&D) results that are the outcomes of R&D projects or other funded activities at DOE labs and facilities nationwide and grantees at universities and other institutions.
Stringer, J. T. & Blanton, W. A.Fuel element study for Reactor Overbore Program,
report,
December 15, 1960;
Richland, Washington.
(https://digital.library.unt.edu/ark:/67531/metadc1311202/:
accessed June 18, 2025),
University of North Texas Libraries, UNT Digital Library, https://digital.library.unt.edu;
crediting UNT Libraries Government Documents Department.