The proposed increased water capacity for 100-K plants will increase the electrical load to be supplied. The load study showed that the capacity of the existing 13.8 kV system is adequate to carry the increased loads proposed for Project CG-775, while for the 5 kV system, an expanded power system is proposed. Likewise, the voltage regulation on the kV system bus will be excessive, and voltage regulators should be added.
Publisher Info:
General Electric Co., Richland, WA (United States). Hanford Atomic Products Operation
Place of Publication:
Richland, Washington
Provided By
UNT Libraries Government Documents Department
Serving as both a federal and a state depository library, the UNT Libraries Government Documents Department maintains millions of items in a variety of formats. The department is a member of the FDLP Content Partnerships Program and an Affiliated Archive of the National Archives.
Descriptive information to help identify this report.
Follow the links below to find similar items on the Digital Library.
Description
The proposed increased water capacity for 100-K plants will increase the electrical load to be supplied. The load study showed that the capacity of the existing 13.8 kV system is adequate to carry the increased loads proposed for Project CG-775, while for the 5 kV system, an expanded power system is proposed. Likewise, the voltage regulation on the kV system bus will be excessive, and voltage regulators should be added.
Physical Description
25 p.
Notes
OSTI as DE94012873; Paper copy available at OSTI: phone, 865-576-8401, or email, reports@adonis.osti.gov
This report is part of the following collection of related materials.
Office of Scientific & Technical Information Technical Reports
Reports, articles and other documents harvested from the Office of Scientific and Technical Information.
Office of Scientific and Technical Information (OSTI) is the Department of Energy (DOE) office that collects, preserves, and disseminates DOE-sponsored research and development (R&D) results that are the outcomes of R&D projects or other funded activities at DOE labs and facilities nationwide and grantees at universities and other institutions.
Thorson, W. R.100-K Area electrical power system load and voltage study for project CG-775. Revision,
report,
February 22, 1960;
Richland, Washington.
(https://digital.library.unt.edu/ark:/67531/metadc1310704/:
accessed September 12, 2026),
University of North Texas Libraries, UNT Digital Library, https://digital.library.unt.edu;
crediting UNT Libraries Government Documents Department.