45-Day safety screening for Tank 241-C-103 push mode sample, riser 2

PDF Version Also Available for Download.

Description

This is the 45-Day report for the Tank 241-C-103 (C-103) push-mode core sampling characterization effort. Problems encountered with the push-mode sampling truck following removal of the first segment from riser 2 resulted in a long delay before resumption of sampling, therefore it was decided to begin the 45-day clock and issue a report based on receipt of this first segment. If subsequent segments are removed from tank C-103, a revision of this report or a new report will be issued to include any new data. Included are copies of the differential scanning calorimetry (DSC) and thermogravimetric analysis (TGA) scans as … continued below

Physical Description

17 p.

Creation Information

Bell, K. E. December 16, 1994.

Context

This report is part of the collection entitled: Office of Scientific & Technical Information Technical Reports and was provided by the UNT Libraries Government Documents Department to the UNT Digital Library, a digital repository hosted by the UNT Libraries. It has been viewed 74 times. More information about this report can be viewed below.

Who

People and organizations associated with either the creation of this report or its content.

Author

Sponsor

Publisher

  • Westinghouse Hanford Company
    Publisher Info: Westinghouse Hanford Co., Richland, WA (United States)
    Place of Publication: Richland, Washington

Provided By

UNT Libraries Government Documents Department

Serving as both a federal and a state depository library, the UNT Libraries Government Documents Department maintains millions of items in a variety of formats. The department is a member of the FDLP Content Partnerships Program and an Affiliated Archive of the National Archives.

Contact Us

What

Descriptive information to help identify this report. Follow the links below to find similar items on the Digital Library.

Description

This is the 45-Day report for the Tank 241-C-103 (C-103) push-mode core sampling characterization effort. Problems encountered with the push-mode sampling truck following removal of the first segment from riser 2 resulted in a long delay before resumption of sampling, therefore it was decided to begin the 45-day clock and issue a report based on receipt of this first segment. If subsequent segments are removed from tank C-103, a revision of this report or a new report will be issued to include any new data. Included are copies of the differential scanning calorimetry (DSC) and thermogravimetric analysis (TGA) scans as requested in Reference 1. Also included is a copy of any immediate notification documentation. Other pertinent documentation will be included in the C-103 216-day report.

Physical Description

17 p.

Notes

OSTI; NTIS; INIS; GPO Dep.

Source

  • Other Information: PBD: 16 Dec 1994

Language

Item Type

Identifier

Unique identifying numbers for this report in the Digital Library or other systems.

Collections

This report is part of the following collection of related materials.

Office of Scientific & Technical Information Technical Reports

Reports, articles and other documents harvested from the Office of Scientific and Technical Information.

Office of Scientific and Technical Information (OSTI) is the Department of Energy (DOE) office that collects, preserves, and disseminates DOE-sponsored research and development (R&D) results that are the outcomes of R&D projects or other funded activities at DOE labs and facilities nationwide and grantees at universities and other institutions.

What responsibilities do I have when using this report?

When

Dates and time periods associated with this report.

Creation Date

  • December 16, 1994

Added to The UNT Digital Library

  • Oct. 12, 2018, 6:44 a.m.

Description Last Updated

  • April 3, 2019, 4:59 p.m.

Usage Statistics

When was this report last used?

Yesterday: 0
Past 30 days: 0
Total Uses: 74

Interact With This Report

Here are some suggestions for what to do next.

Start Reading

PDF Version Also Available for Download.

International Image Interoperability Framework

IIF Logo

We support the IIIF Presentation API

Bell, K. E. 45-Day safety screening for Tank 241-C-103 push mode sample, riser 2, report, December 16, 1994; Richland, Washington. (https://digital.library.unt.edu/ark:/67531/metadc1280499/: accessed April 24, 2024), University of North Texas Libraries, UNT Digital Library, https://digital.library.unt.edu; crediting UNT Libraries Government Documents Department.

Back to Top of Screen