This report is written to provide information concerning the status of the Hot Semiworks facility as it is placed in stand-by on July 1, 1957. The plant was constructed in 1951 and early 1952. It vas operated on Redox type investigations until the last of 1953. The plant was then converted to the Purex flowsheet under Project CA 513 D. Operations on the Purex type investigations were started in early 1955 and continued until early in 1956. At that time a maintenance program for plant improvement and repair was initiated. This program was completed on July 1, 1957. Statements are …
continued below
Publisher Info:
General Electric Co., Richland, WA (United States). Hanford Atomic Products Operation
Place of Publication:
Richland, Washington
Provided By
UNT Libraries Government Documents Department
Serving as both a federal and a state depository library, the UNT Libraries Government Documents Department maintains millions of items in a variety of formats. The department is a member of the FDLP Content Partnerships Program and an Affiliated Archive of the National Archives.
Descriptive information to help identify this report.
Follow the links below to find similar items on the Digital Library.
Description
This report is written to provide information concerning the status of the Hot Semiworks facility as it is placed in stand-by on July 1, 1957. The plant was constructed in 1951 and early 1952. It vas operated on Redox type investigations until the last of 1953. The plant was then converted to the Purex flowsheet under Project CA 513 D. Operations on the Purex type investigations were started in early 1955 and continued until early in 1956. At that time a maintenance program for plant improvement and repair was initiated. This program was completed on July 1, 1957. Statements are contained in this report which pertain to the present status of physical equipment and facilities and the adequacy, operating experience, recommendations for improvement, previous work, and future considerations of the plant. However, the primary intent of the report is to provide pertinent information to personnel associated with a future start-up. For this reason, certain parts of the report are quite detailed. Only statements concerning the existing or previous state of the facility and equipment are factual. Others are opinions or experiences of plant operating personnel. Emphasis has also been placed on the faults encountered rather than the good features of the plant, in order that these faults might be corrected in the future.
Physical Description
82 p.
Notes
OSTI as DE94003822; Paper copy available at OSTI: phone, 865-576-8401, or email, reports@adonis.osti.gov
This report is part of the following collection of related materials.
Office of Scientific & Technical Information Technical Reports
Reports, articles and other documents harvested from the Office of Scientific and Technical Information.
Office of Scientific and Technical Information (OSTI) is the Department of Energy (DOE) office that collects, preserves, and disseminates DOE-sponsored research and development (R&D) results that are the outcomes of R&D projects or other funded activities at DOE labs and facilities nationwide and grantees at universities and other institutions.