CONTENTS
Summary--
Introduction -
Scope of report--
Acknowledgments--
Projects Nos. 4 and 5-
Description -
Project No. 4_ -
Project No. 5-
Disposal of water from tunnel
Geologic structure---
Treatment of mine water__
Problems considered---
Plan of proposed improvements
Main tunnels ---
Construction shafts
Estimated cost__-__
Construction schedule
Cooperation with local interests-
Conclusions ---
Recommendations_ --
Bibliography-Page
1
2
2
2
3
3
3
3
3
6
9
10
11
11
15
16
18
21
21
22
23ILLUSTRATIONS
Extent and configuration of the anthracite region of Pennsylvania ------------------------------Facing 3
Line of proposed Conowingo tunnel _ - - - - -- - - - - - 4
Schematic flow chart of proposed Conowingo tunnel system -- --- -_ _____--_-__Pocket
Geologic map of area along the line of section of the Conowingo drainage tunnel proposed in Project No. 4 7
Longitudinal section along line of section of the Conowingo drainage tunnel proposed in Project No. 4-. Pocket
Geologic map of the area to be traversed by Project No. 5 -----------------------------------------Pocket
Plan map and section along line of tunnel proposed in Project No. 5 -----------------------------Pocket
Plan map and section along line of tunnel proposed in Project No. 5 to Marcus Hook, Pa --Pocket
Hydraulic properties of tunnel sections (full) -- -- 12
Hydraulic properties of tunnel sections (92 percent full) -- -- 13
Hydraulic properties of tunnel sections (50 percent full) --- 14
Circular tunnel (unsupported) - ___15
Circular tunnel (supported 1800) - --------- 16
Typical design for construction shaft _--___17
Graphic schedule of time and disbursements estimated to complete Project No. 4 --19
Graphic schedule of time and disbursements estimated to complete Project No. 5 ----------------Facing 20TABLES
1. Data on test boreholes on line of proposed drainage tunnel in Projects Nos. 4 and 5
2. Tunnel-construction quantities required (excavation and concrete) ----
3. Altitudes and depths of construction shafts --_ ___ ____- -
4. Preliminary construction-cost estimate for Project No. 4 of the Conowingo tunnel -
5. Preliminary construction-cost estimate for Project No. 5 of the Conowingo tunnel
IIIFig.
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.9
15
16
18
18
Upcoming Pages
Here’s what’s next.
Search Inside
This report can be searched. Note: Results may vary based on the legibility of text within the document.
Tools / Downloads
Get a copy of this page or view the extracted text.
Citing and Sharing
Basic information for referencing this web page. We also provide extended guidance on usage rights, references, copying or embedding.
Reference the current page of this Report.
Ash, S. H. (Simon Harry), b. 1889; Dierks, H. A. & Kennedy, D. O. Flood Prevention in Anthracite Mines: Anthracite Region of Pennsylvania, Projects Numbers 4 and 5, report, 1956; Washington D.C.. (https://digital.library.unt.edu/ark:/67531/metadc12716/m1/3/: accessed April 19, 2024), University of North Texas Libraries, UNT Digital Library, https://digital.library.unt.edu; crediting UNT Libraries Government Documents Department.