SM-2 Fuel Element Welding Development : Task 5.0

One of 93 reports in the series: AEC Research and Development Report available on this site.

PDF Version Also Available for Download.

Description

Abstract: Development of welding processes for stainless steel fuel elements, previously initiated by Alco Products, was continued in Task 5. Three objectives were accomplished; (1) development of a suitable reference welding process, (2) evaluation by out-of-pile tests of the structural integrity of reference welded fuel elements, and (3) preparation of specifications and fabrication procedures for the reference welding process.

Physical Description

xii, 65 pages ; illustrations.

Creation Information

Harris, R. L. August 11, 1960.

Context

This report is part of the collection entitled: Technical Report Archive and Image Library and was provided by the UNT Libraries Government Documents Department to the UNT Digital Library, a digital repository hosted by the UNT Libraries. It has been viewed 17 times. More information about this report can be viewed below.

Who

People and organizations associated with either the creation of this report or its content.

Author

Publisher

Audiences

We've identified this report as a primary source within our collections. Researchers, educators, and students may find this report useful in their work.

Provided By

UNT Libraries Government Documents Department

Serving as both a federal and a state depository library, the UNT Libraries Government Documents Department maintains millions of items in a variety of formats. The department is a member of the FDLP Content Partnerships Program and an Affiliated Archive of the National Archives.

Contact Us

What

Descriptive information to help identify this report. Follow the links below to find similar items on the Digital Library.

Titles

Description

Abstract: Development of welding processes for stainless steel fuel elements, previously initiated by Alco Products, was continued in Task 5. Three objectives were accomplished; (1) development of a suitable reference welding process, (2) evaluation by out-of-pile tests of the structural integrity of reference welded fuel elements, and (3) preparation of specifications and fabrication procedures for the reference welding process.

Physical Description

xii, 65 pages ; illustrations.

Notes

Digitized from microopaque cards.

Contract No. AT(30-3)-326 with U.S. Atomic Energy Commission, New York Operations Office.

Includes bibliographic references (page 63).

Subjects

Library of Congress Subject Headings

Language

Item Type

Identifier

Unique identifying numbers for this report in the Digital Library or other systems.

  • Report No.: APAE-70
  • Grant Number: AT(30-3)-326
  • SuDoc Number: Y 3.AT 7:22/APAE-70
  • Accession or Local Control No: metadc1201963
  • Archival Resource Key: ark:/67531/metadc1201963

Collections

This report is part of the following collections of related materials.

Technical Report Archive and Image Library

The Technical Report Archive & Image Library (TRAIL) identifies, acquires, catalogs, digitizes and provides unrestricted access to U.S. government agency technical reports. The mission of TRAIL is to ensure preservation, discoverability, and persistent open access to government technical publications regardless of form or format.

TRAIL Microcard Collection

Imaged from microcard, these technical reports describe research performed for U.S. government agencies from the 1930s to the 1960s. The reports were provided by the Technical Report Archive and Image Library (TRAIL).

What responsibilities do I have when using this report?

When

Dates and time periods associated with this report.

Creation Date

  • August 11, 1960

Added to The UNT Digital Library

  • Aug. 15, 2019, 10:26 p.m.

Description Last Updated

  • March 20, 2023, 5:47 p.m.

Usage Statistics

When was this report last used?

Yesterday: 0
Past 30 days: 0
Total Uses: 17

Interact With This Report

Here are some suggestions for what to do next.

Start Reading

PDF Version Also Available for Download.

International Image Interoperability Framework

IIF Logo

We support the IIIF Presentation API

Harris, R. L. SM-2 Fuel Element Welding Development : Task 5.0, report, August 11, 1960; Schenectady, New York.. (https://digital.library.unt.edu/ark:/67531/metadc1201963/: accessed March 28, 2025), University of North Texas Libraries, UNT Digital Library, https://digital.library.unt.edu; crediting UNT Libraries Government Documents Department.

Back to Top of Screen